HalluciGen, Inc. terminals

From The Vault - Fallout Wiki
Jump to: navigation, search
 
Gametitle-FO4.png
Gametitle-FO4.png

This page presents the content of the terminals within the HalluciGen, Inc. as is in game.

Reception Terminal[edit | edit source]

Note: This desk terminal is located on the receptionists counter in the foyer.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink
HalluciGen, Inc. - Reception

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Verify that all executive staff have been escorted to safety, then leave the building immediately.

Procedure: Test Subject Intake[edit | edit source]

TranscriptVaultBoy.png

HalluciGen Test Subject Intake Procedure
v.1.35, 8/12/77

- Request ID. Cross-check with the day's test schedule. Verbally confirm that the visitor is a test subject, not a client.
- Offer refreshments.
- Instruct subjects to fill out intake forms 12-A through 12-H. This should allow sufficient time for the sedatives in the water to take effect.
- Notify the appropriate lab personnel.
- When instructed, complete form 12-I (dismissal), 12-J (accident report), or 12-K (fatal accident report).

Procedure: Chemical Emergencies[edit | edit source]

TranscriptVaultBoy.png

HalluciGen Chemical Emergency Procedure
Version 1.00, 3/15/76

In the unlikely event of a major chemical leak:
- Executive staff should evacuate immediately.
- Science staff should terminate any ongoing experiments. If test subjects are present, the lab manager shall determine whether to lock down the test chambers or evacuate them.
- Clerical staff should escort executives to safety, then evacuate.

Due to HalluciGen's in-building air recycling system, chemical agents may take days or weeks to disperse naturally. Do not attempt to reenter the building until cleared to do so.

Research Terminal[edit | edit source]

Note: This desk terminal is located on a desk next to the northern research office on the second floor. It is locked Novice.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

[Current Prototype]
Prototype ID: Suppressor
Status: INACTIVE

Activate Current Prototype[edit | edit source]

Note: Accessing this command activates the "suppressor" prototype.

TranscriptVaultBoy.png

Accessing prototype device... done.
Verifying build integrity... complete.

Commencing test. Please take appropriate safety precautions.

Deactivate Current Prototype[edit | edit source]

Note: Accessing this command deactivates the "suppressor" prototype.

TranscriptVaultBoy.png

Accessing prototype device... done.
Shutting down.

View Current Prototype Details[edit | edit source]

Note: Accessing this command displays the status of the the "suppressor" prototype when deactivated.

TranscriptVaultBoy.png

Accessing prototype device... done.

Prototype ID: Suppressor
Firmware: v0.062.101
Electrical Output: 1450V/0.6A/500J
Status: INACTIVE

Product Objective: Non-lethal target suppression via electrical discharge.

Note: Accessing this command displays the status of the the "suppressor" prototype when activated.

TranscriptVaultBoy.png

Accessing prototype device... done.

Prototype ID: Suppressor
Firmware: v0.062.101
Electrical Output: 1450V/0.6A/500J
Status: ACTIVE

Product Objective: Non-lethal target suppression via electrical discharge.

View Lab Reports[edit | edit source]

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

Lab Report: HalluciGen Gas[edit | edit source]

TranscriptVaultBoy.png

Test Protocol: 59-211-01
Product: HalluciGen Gas
Goal: Riot Pacification
Delivery Vehicle: Type-II Fragmentation Grenade
Report:
- 2/5 injured by grenade explosion (1 seriously).
- 5/5 suffered traumatic adrenal gland rupture due to gas exposure, resulting in hallucinations, erratic behavior, increased aggression (frenzy).
- 4/5 killed in ensuing melee.
- 1/5 died due to heart failure.

Similar to previous tests. At the concentrations required for wide-area dispersal, massive adrenaline surges occur. Recommend revising the chemical substrate.

Lab Report: Irradicator[edit | edit source]

TranscriptVaultBoy.png

Test Protocol: 27-391-04
Product: HalluciGen Irradicator
Goal: Field Decontamination
Delivery Vehicle: Class-IV Ventilators (x4)
Report:
- 49/50 biochemical contaminants neutralized.
- 3/3 subjects suffered lethal doses of radiation.
- Test chamber heavily irradiated. All panels and insulation replaced.

Consider reclassifying for lethal weapons research. Irradicator power supply requires further development; current 2-ton weight unsuitable for field deployment.

Database network: OFFLINE[edit | edit source]

TranscriptVaultBoy.png

Database Network
Status: OFFLINE
Database network access is granted to authorized personnel only.

TranscriptVaultBoy.png

> Connecting...

Database network: ONLINE[edit | edit source]

Note: This entry is only available once Learning Curve is active for this specific location.

TranscriptVaultBoy.png

Database Network
Status: ONLINE


Main Menu
- DELETED
- DELETED
- DELETED

For your safety, this database is now property of the Brotherhood of Steel.
- Ad victoriam

TranscriptVaultBoy.png

> Connecting...

Accounting Terminal[edit | edit source]

Note: This desk terminal is located on a desk in the accounting office, on the third floor.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink
HalluciGen, Inc. - Accounting

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

Third Quarter Financials, Draft 1[edit | edit source]

TranscriptVaultBoy.png

Hallucigen, Inc. Releases Third Quarter Financials
*DRAFT 1 - Not for Public Release*

HalluciGen, Inc. reported a net operating loss of $1.8 billion for the third quarter.

HalluciGen, now in its third year of operation, aspires to be the world leader in cutting-edge nonlethal technology for police and military use.

HalluciGen President and CEO Eric Rice stated: "This has been a difficult quarter, with significant delays in several major product lines. Nonetheless, we remain optimistic about the potential of our research, and hope to achieve a positive cash flow within the next two years."

Third Quarter Financials, Draft 2[edit | edit source]

TranscriptVaultBoy.png

Hallucigen, Inc. Releases Third Quarter Financials
*DRAFT 2 - Not for Public Release*

HalluciGen, Inc. is pleased to report third quarter revenue of $1.1 billion.

HalluciGen, now in its third year of operations, aspires to be the world leader in cutting-edge nonlethal technology for police and military use.

HalluciGen President and CEO Eric Rice stated: "Our long-term contracts have provided us with a strong financial foundation. In the current global political climate, we expect a tremendous demand for our products in the months and years ahead."

Test Chamber Terminal[edit | edit source]

Note: This desk terminal is located on the cabinet within test chamber 2, although it will disappear along with the entire contents of the room when the "Invisiwave" is activated. It is locked Novice.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink
HalluciGen, Inc. - Test Chamber 2

Note: This header is displayed as default.

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

***EMERGENCY ALERT***
A security lockdown is in effect.

***ERROR***
Data corruption detected. All research data on this machine has been compromised. Please contact a technician for assistance.

Note: This header is displayed if xxxxx.

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

***EMERGENCY ALERT***
A security lockdown is in effect.

Note: This header is displayed if xxxxx.

TranscriptVaultBoy.png

***EMERGENCY ALERT***
The security lockdown has been overridden for this test chamber. Please notify your supervisor.

***ERROR***
Data corruption detected. All research data on this machine has been compromised. Please contact a technician for assistance.

Note: This header is displayed if xxxxx.

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

***ERROR***
Data corruption detected. All research data on this machine has been compromised. Please contact a technician for assistance.

Override Lockdown - Test Chamber 2[edit | edit source]

Note: Accessing this command xxxxx.

TranscriptVaultBoy.png

Activating localized security override... done.
Maglock released. Opening door...

Observation Room Terminal[edit | edit source]

Note: This desk terminal is located on the desk in the observation room above the third floor test chambers, on the fourth floor. It is locked Advanced.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink
HalluciGen, Inc. - Observation Room

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

Procedure: Observation Lab[edit | edit source]

TranscriptVaultBoy.png

HalluciGen Observation Lab Procedure
v.2.25, 6/22/77

- Greet VIPs.
- Introduce HalluciGen, relevant products.
- Activate automated demonstration system.
- Observe automated demonstration. When malfunctions occur, trigger a different demonstration to switch focus.
- In the event of catastrophic failure, or immediately following tests of the Irradicator, escort VIPs to the conference room for a marketing presentation.
- Clear labs of test subjects, blood, fluids.
- After a test of the Irradicator, notify Facilities to replace the test chamber.

End Security Lockdown[edit | edit source]

Note: Activating this command xxxxx xxxxx.

TranscriptVaultBoy.png

Terminating lockdown procedure... done.
Releasing test chamber maglocks... done.

An Emergency Alert remains in effect. Please evacuate all test subjects.

CEO's Terminal[edit | edit source]

Note: This desk terminal is located on the desk in the CEO's office , on the fourth floor. It is locked Expert, however it can also be accessed with the HalluciGen master password.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink
HalluciGen, Inc. - Office of Eric Rice, CEO

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

Appointment Calendar: 10/25/77[edit | edit source]

TranscriptVaultBoy.png

Appointment Calendar for
Monday, October 25th, 2077

09:00 - Senior staff briefing
10:30 - Review third quarter financials w/ Paul
11:00 - Lunch w/ Damien
12:30 - Human Subjects protocol review w/ Dr. Everill, Ethics Review Board. (Offer water?)
14:00 - Greet VIP: Col. Thomas Nelson, US Army (SCYTHE)
14:30 - Review slides for procurement conference
16:00 - Post-demo sales meeting w/ Col. Nelson

Mainframe Access Terminal[edit | edit source]

Note: This console terminal is located on the mainframe access console, in the basement. It is locked Novice,.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink
HalluciGen, Inc. - Mainframe Access

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

Mainframe Status[edit | edit source]

TranscriptVaultBoy.png

Mainframe Status

1/10 Servers: Normal
4/10 Servers: No Response / Disconnected
5/10 Serrvers: Critical Failure

1 Administrator(s) and 0 User(s) are active.

WARNING: Critical system failures have been detected. Replace the affected machines as soon as possible to prevent data loss.

Master Password Reset[edit | edit source]

Note: Accessing this command xxxxx xxxxx.

TranscriptVaultBoy.png

Resetting all passwords on the network... done.

All terminal passwords have now been reset to: Admin-3.

Decontamination Control Terminal[edit | edit source]

Note: This desk terminal is located on a desk in the decontamination control room, in the basement. It is locked xxxxx, however it can also be accessed with HalluciGen master password.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink
HalluciGen, Inc. - Decontamination Control

Note: Accessing the stop decontamination command will cause the terminal to display this header, this is also the default header.

TranscriptVaultBoy.png

SYSTEM STATUS:
Decontamination Chamber: INACTIVE

Note: Accessing the start decontamination command will cause the terminal to display this header.

TranscriptVaultBoy.png

SYSTEM STATUS:
Decontamination Chamber: ACTIVE

Start Decontamination[edit | edit source]

Note: Accessing this command will activate the decontamination chamber, clearing said chamber of the HalluciGen Gas.

TranscriptVaultBoy.png

Accessing Decontamination Arches... done.
Initializing Decontamination Process... done.

Decontamination in progress. Please instruct personnel to proceed into the decontamination chamber.

Stop Decontamination[edit | edit source]

Note: Accessing this command will deactivate the decontamination chamber.

TranscriptVaultBoy.png

Accessing Decontamination Arches... done.
Terminating Decontamination Process... done.

Development Lab Terminal[edit | edit source]

Note: This desk terminal is located on the cabinet in the development laboratory, in the basement.

TranscriptVaultBoy.png

Welcome to ROBCO Industries (TM) Termlink
HalluciGen, Inc. - Development Lab Manager's

TranscriptVaultBoy.png

***EMERGENCY ALERT***
A chemical leak has been detected. Evacuate the building immediately.

10/25 - Test Results: InvisiWave[edit | edit source]

TranscriptVaultBoy.png

Test Results
Product: InvisiWave
Date: 10/25

Third test a complete success. Admiral was impressed, inquired about shipboard installations.

DM: Your 'InvisiWave' is five mirrors, two hacked Stealth Boys, and a trap door. Makes for a splashy demo, but you really crossed the line this time. Sales wants two hundred units by December. Good luck with that.

10/21 - Test Results: Irradicator[edit | edit source]

TranscriptVaultBoy.png

Test Results
Product: Irradicator
Date: 10/25

All biological and chemical contaminants destroyed. Subject and test chamber received 5100 rads radiation. Observers left the viewing room before subject's skin disintegrated. Test chamber stripped and reconstructed.

DM: So you've built a two-ton machine that irradiates people? What part of 'hand-held field decontaminator' did you not understand? Points for getting the VIPs out before things got messy, though.

10/18 - Test Results: Dispersant[edit | edit source]

TranscriptVaultBoy.png

Test Results
Product: Dispersant
Date: 10/18

Subject survived test, failed to recover from treatment. Ran screaming at sight of own child in waiting room. Police still in pursuit.

Update: 10/20: Apprehended. Subject institutionalized.

DM: Dispersant is supposed to *stop* riots, not start them. This entire line of research is a joke. I'm transferring the project to Karyn. Send her your files and destroy your samples. Then clean out your desk.

10/18 - Test Results: HalluciGen Gas[edit | edit source]

TranscriptVaultBoy.png

Test Results
Product: HalluciGen Gas
Date: 10/18

Despite new formulation, gas still caused traumatic adrenal gland rupture and frenzy in 4/5 subjects. One survived initial exposure and began to acclimate before being beaten to death by the other subjects.

DM: Adjust dosage, retest. At least this is making progress. If marketing would just position this as a military-grade chemical weapon, we'd be done here. Would make a good grenade or artillery shell.

10/17 - Test Results: Suppressor[edit | edit source]

TranscriptVaultBoy.png

Test Results
Product: Suppressor
Date: 10/17

Subjects successfully incapacitated. Paralysis appears to be permanent. Transferred to Medford Memorial for monitoring.

DM: You were the LEAD ENGINEER on the damn Mesmetron, and you can't even get crowd pacification right? With one of your own prototypes to reverse-engineer? What, did they mezz you on the way out? You're the highest-paid researcher here. I expected better.