We've Moved! Just as Gamepedia has joined forces with Fandom, this wiki had joined forces with our Fandom equivalent. The wiki has been archived and we ask that readers and editors move to the now combined wiki on Fandom. Click to go to the new wiki.

Nuka-World Transit Center terminals

From The Vault - Fallout Wiki
Jump to: navigation, search
 
Gametitle-fo4nw.png
Gametitle-fo4nw.png

This page presents the content of the terminals within the Nuka-World Transit Center as is in game.

Nuka-Express Control Terminal

Note: This console terminal is located behind the cashiers counter within the station. It is locked or can be accessed with the control terminal password.

TranscriptVaultBoy.png

Property of the Nuka-Cola Corporation
Nuka-Express Operations Control

TranscriptVaultBoy.png

Please make a selection:

Monorail Schedule

TranscriptVaultBoy.png

The Nuka-Express is expected to run every 15 minutes. This system automatically notified corporate of all unauthorized delays.

Sunday - Thursday
- 6:00 am thru 9:30 am: Employees only.
- 9:45 am thru 11:55 pm: All traffic allowed.
- 12:00 am: Closed

Friday - Saturday
- 6:00 am thru 8:30 am: Employees only.
- 8:45 am thru 11:55 pm: All traffic allowed.
- 12:00 am: Closed

Power Grid Management

Note: This header is displayed when .

TranscriptVaultBoy.png

Nuka-Express Operations Control

Transit Center Power Status:
Main Power: ***OFFLINE***
Emergency Power: ON
Auxiliary Power: OFF
Railway Power: OFF

Please make a selection:

Note: This header is displayed when .

TranscriptVaultBoy.png

Nuka-Express Operations Control

Transit Center Power Status:
Main Power: ***OFFLINE***
Emergency Power: ON
Auxiliary Power: ON
Railway Power: OFF

Please make a selection:

Note: This header is displayed when .

TranscriptVaultBoy.png

Nuka-Express Operations Control

Transit Center Power Status:
Main Power: ***OFFLINE***
Emergency Power: ON
Auxiliary Power: OFF
Railway Power: ON

Please make a selection:

Note: This header is displayed when .

TranscriptVaultBoy.png

Nuka-Express Operations Control

Transit Center Power Status:
Main Power: ***OFFLINE***
Emergency Power: ON
Auxiliary Power: ON
Railway Power: ON

Please make a selection:

Activate Railway Power

Note: Accessing this command .

TranscriptVaultBoy.png

Accessing railway generators... COMPLETE.
Routing power to rails... COMPLETE.

*** Please exercise caution. Railways are now active.

Activate Auxiliary Power

Note: Accessing this command .

TranscriptVaultBoy.png

Accessing auxiliary generators... COMPLETE.
Re-routing power... COMPLETE.

*** Please report main power deficiency to maintenance.

Cancel

Note: Accessing this command brings the Sole Survivor back to the main menu.

Maintenance Requests

TranscriptVaultBoy.png

Please make a selection:

10/02/77 - Clogged Water Fountain

TranscriptVaultBoy.png

STATUS: CLOSED
Entered By: K. O'Rourke
Some kid shoved gum down the water fountain nozzle again.

Assigned To: G. Mackey
Removed disgusting, fluorescent green gum from nozzle. Recommend surveillance to hunt down and punish repeat offender. Permanent ban from park would be ideal. This is the sixth time.

10/07/77 - Announcements Repeating

TranscriptVaultBoy.png

STATUS: CLOSED
Entered By: P. Reading
Announcements over PA are stuck on the same announcement about Nuka-Cola Dark.

Assigned To: G. Mackey
Rebooted horribly wretched announcement system. Recommend a punishment of death for its detestable creator. I am free on Saturday if someone wants to put together a firing squad.

10/13/77 - Unresponsive Protectron

TranscriptVaultBoy.png

STATUS: CLOSED
Entered By: K. O'Rourke
One of the Protectrons is completely unresponsive. It's frozen at the bottom of the escalator and blocking pedestrian traffic.

Assigned To: G. Mackay
Today's lesson, Protectrons need to be returned to their pods every evening. Recommend hiring some competent people to run the Transit Center and not just handing over the job to some kid whose daddy works for sales.

10/15/77 - Clogged Water Fountain

TranscriptVaultBoy.png

STATUS: CLOSED
Entered By: K. O'Rourke
More gum blocking the water fountain nozzle.

Assigned To: G. Mackay
Removed vile blockage yet again. Seriously, this kid is going down. Did a little Protectron programming to keep a special eye out for this one.

10/22/77 - Monorail Door Ajar

TranscriptVaultBoy.png

STATUS: CLOSED
Entered By: P. Reading
Monorail door is not closing completely. Remains slightly ajar.

Assigned To: J. Crosby
Lining was old and had fallen out of place, preventing the door from closing. Stripped out and replaced.

Employee Notifications

TranscriptVaultBoy.png

Please make a selection:

Service With A Smile!

TranscriptVaultBoy.png

To All Employees:

The Nuka-Cola Corporation is determined to deliver the best possible customer experience available. The first Nuka-World representatives our valuable customers will encounter are here at the Transit Center. Therefore, Transit Center employees are expected to be helpful and appear happy at all times.

As a reminder, this is part of your job description. Failure to comply will result in termination without notice.

- Management

10/02/77 - Updated Schedule for Fall

TranscriptVaultBoy.png

To All Employees:

Please note that the schedule has been updated for the month of October. This is out final month of the season, so let's make it count!

- Management

10/16/77 - Employee Termination

TranscriptVaultBoy.png

To All Employees:

The Nuka-Cola Corporation is currently investigating former employee Gordon Mackey after a Protectron malfunction that resulted in injury to a child. Please do not discuss this matter with anyone outside of the company.

- Management