We've Moved! Just as Gamepedia has joined forces with Fandom, this wiki had joined forces with our Fandom equivalent. The wiki has been archived and we ask that readers and editors move to the now combined wiki on Fandom. Click to go to the new wiki.

Nuka-World power plant terminals

From The Vault - Fallout Wiki
Jump to: navigation, search
 
Gametitle-fo4nw.png
Gametitle-fo4nw.png

This page lists Nuka-World power plant terminals.

Nuka-World Power: Employee Terminal

Note: This desk terminal is located on the desk in the main office.

TranscriptVaultBoy.png

Property of the Nuka-Cola Corporation
Nuka-World Power: Employee Station 003

TranscriptVaultBoy.png

All internal communication may be monitored for training/evaluation purposes

System Status

TranscriptVaultBoy.png

SYSTEM ERROR:::

SENSOR FAILURE

SENSORS 0001- 0905 OFFLINE

STATION POWER-UP NOT RECOMMENDED AT THIS TIME

CONTACT PARK MAINTENANCE IMMEDIATELY

Employee Communications

TranscriptVaultBoy.png

All internal communication may be monitored for training/evaluation purposes

4/28 Meltdown

TranscriptVaultBoy.png

What the HELL happened?

We submitted a full report last week, explaining the whole series of failures that resulted in who knows how much contamination. WHY WASN'T THE PARK OPENING DELAYED?

-C. Carlson

RE: 4/28 Meltdown

TranscriptVaultBoy.png

To all employees:

After consulting our Corporate Offices, and careful examination of the events, it has been determined that on-site evaluation of the Class 7 event was performed incorrectly, and that the incident was not nearly as severe as initially feared.

The good folks at Corporate assured us that everything is great, we're going to have a great season, and ask that you please read through pages 94-107 of your Employee Agreement, specifically with regards to the dissemination of any information about your work here at the parks. They'd like to remind you that discussion of any events on park grounds is a violation of that agreement and could result in administrative action.

Thanks all - let's have a great year!

T. O'Connor
Director, Human Resources

N.I.R.A.

TranscriptVaultBoy.png

Buckley,

Please send another message up the chain. That damn robot has been found 3 times this week banging into the exterior security doors on the power plant.

The thing needs reprogramming, or something. Does anyone understand how much havoc it could cause if it got inside and started bumbling around near the controls?

I don't know about you guys, but I think that thing is creepy as hell.

T. Reynolds

Upgrades?

TranscriptVaultBoy.png

What is it going to take?

8 years now since the last plant overhaul. That's before Galactic Zone even opened, and we all know what a power hog that is.

Saunders says the last inspection was a joke, that the guy never even really took a good look at the equipment. Just sat in the control room jawing with the executives, then signed the paperwork and went on his way.

We're gonna have some massive problems really soon. Wouldn't the company rather spend a little money now on upgrades than a ton of money on fixes and PR later???

T. Larson

Employee Snack Breaks

TranscriptVaultBoy.png

Hey guys,

I've been asked to pass along a message from Corporate.

They're concerned that folks are bringing in and eating too much outside, non-Nuka branded food and drink for their breaks.

They'd like everyone to please consider buying their break-time snacks from the park itself. It's not mandated right now, just a suggestion.

Let me know if you have any issues.

A. Buckley

Additional Shifts Available

TranscriptVaultBoy.png

Hey, everyone.

Since we're coming up on the end of the season, and we're a little short-staffed already, what with Carlson being fired and all, I just wanted to put it out there that we've got additional shifts available for anyone looking to make a few extra bucks.

We're doubling staff here at the plant for the last 4 weeks of the season, leading up to the parks "Halloween Spooktacular" event, which as we all know is a big one for Corporate.

If you'd like to sign up, the forms are in the office. We'll be offering time-and-a-fifth for pay, so it's a pretty great deal.

A. Buckley

Nuka-World Power: Oversight Terminal

Note: This console terminal is located on the rooftop control niche, on the east forward wall. It can only be accessed either when Power Play is active, or when all the raider leaders are killed during Open Season.

TranscriptVaultBoy.png

Property of the Nuka-Cola Corporation
Nuka-World Power: Incident Reporting

TranscriptVaultBoy.png

As per management direction, all incidents require proper documentation to minimize liability in the event of a civil/criminal suit. Please consult your supervisor to ensure that all necessary steps are taken.

Incident Reports

TranscriptVaultBoy.png

As per management direction, all incidents require proper documentation to minimize liability in the event of a civil/criminal suit. Please consult your supervisor to ensure that all necessary steps are taken.

Report #0674

TranscriptVaultBoy.png

Date: 10/20/77
Incident Type: Main Power Failure
Filing Employee: A. Buckley
Notes: Lighting test for upcoming "Halloween Spooktacular" event tripped main breakers. Employees would like to note that repeated complaints have been entered regarding the power load of said event on an aging system that has not been updated in at least the last 7 years.

Report #0673

TranscriptVaultBoy.png

Date: 8/18/77
Incident Type: Unexpected Full Reboot
Filing Employee: N. Otto
Notes: After-hours system failure resulting in full reboot of all power relays. Employee error cited as primary cause - C. Carlson has received 2nd reprimand in his file.

Report #0672

TranscriptVaultBoy.png

Date: 6/12/77
Incident Type: Sustained Voltage Sag - Galactic Zone
Filing Employee: A. Buckley
Notes: 90-second sag resulting in electrical/mechanical malfunctions across Galactic Zone.

Fault traced to vomit on exposed wiring on "Handy Scrambler." Recommend that splash guards be installed on all critical systems to prevent future incidents.

Report #0671

TranscriptVaultBoy.png

Date: 4/28/77
Incident Type: Forced Shut Down -- [REDACTED]
Filing Employee: A. Buckley
Notes: Critical Failure of [REDACTED] due to series of events starting with [REDACTED] blockage in secondary pump system, followed by PORV in [REDACATED] stuck in OPEN position. This resulted in loss of [REDACTED] m3 of coolant, and possible leakage of [REDACTED] into park river.

UPDATE: Corporate review of this incident has determined that no major faults can be found, incident was mis-characterized as a Class 1 Failure when in fact it was merely a Class 7 event. Park operation can continue as normal, and this should not affect the upcoming season opening.

Report #0670+

TranscriptVaultBoy.png

ALL PRIOR REPORT DATA SENT TO CORPORATE HEADQUARTERS

RETAIN LOCAL COPIES PURSUANT TO PROCEDURE O-23.C

File New Report

TranscriptVaultBoy.png

SYSTEM ERROR:::

Network Offline. Please check all cables and verify connection...

Generic terminals

  • Security door control - this door control program is located on a wall terminal accessing a machine (with power armor station, an armor and weapons workbenches) shop.