Fallout Wiki
Advertisement
Fallout Wiki

The Mount Blair terminal entries are a series of entries found on a terminal at Mount Blair in Fallout 76.

Rockhound terminal six[]

FO76 Mount Blair trainyard (Rockhound terminal six)
Transcript

Copyright 2070 Hornwright Industrial
Rockhound Terminal Six Systems Status

Reactor Technology[]

Transcript

Loading...

Transcript

Your Rockhound Excavator is powered by four Ignition Reactors that utilize proprietary technology developed by our research team at Hornwright Industrial. These reactors use an Ignition Core refueling system that should ensure an endless supply of energy to keep your operation in business for years to come. Ignition Cores can be purchased from our parts department, or you can construct them using the included blueprints that have been uploaded to your data device.

--==Ignition Core Blueprints Uploaded==-

Reactor Technology[]

Transcript

Loading...

Transcript

--==WARNING==--
You are not an authorized owner of the Mount Blair facility. If you believe you're recievingIn-game spelling, punctuation and/or grammar this message in error, please speak to your shift supervisor or contact Maintenance.

Standard Bulletin ST17-44PRD[]

Transcript

Loading...

Transcript

Standard Bulletin ST17-44PRD
From: Mary Blake, Hornwright Industrial Public Relations
Code: HI09-21ABR
Subject: Sample ""Welcome Package"" Message

Congratulations on your purchase of the Hornwright Industrial EXC-97 ""Rockhound"" Bucket-wheel Excavator unit! On behalf of everyone here at Hornwright, we'd like to welcome you to the tantalizingly lucrative world of strip mining.

Your Rockhound is rated to move over 11,000 cubic meters of earth per hour and can operate with a crew of only twelve. Each of the buckets on the massive cutting wheel are cast from solid black titanium, ensuring every cut will remain accurate and deep. If you have any questions, feel free to call our Rockhound Technical Team twenty-four hours a day, seven days a week. Happy hunting!

Daniel Hornwright
CEO Hornwright Industrial

Technical Bulletin HI09-21PIC[]

Transcript

Loading...

Transcript

Technical Bulletin HI09-21PIC
From: Don Mobley, Lead Tech Hornwright Industrial
Code: HI09-21ABR
Severity: Green

Reports are surfacing that properly calibrated Ignition Cores are draining in three minutes. As a result, all reactors need to be adjusted from 2200MWe to 1750MWe. This will allow the Ignition Cores to remain in operation for a longer amount of time before replacement is required. We're working hard to increase efficiency, so please stay tuned.

Technical Bulletin HI09-33MDC[]

Transcript

Loading...

Transcript

Technical Bulletin HI09-33MDC
From: Don Mobley, Lead Tech Hornwright Industrial
Code: HI09-33MDC
Severity: Red

We've had an emergency shutdown today on the Rockhound due to hydraulic fluid loss in the main drive shaft. We've traced the leak to some faulty seals on the main fluid reservoir. A standard safety check should have detected this issue before it became critical. There was over 6,000 gallons of fluid soaking into the ground which nobody on the Mount Blair team seemed to notice. This is unacceptable. Seal replacement and tank refill should take approximately two days to fix. We'll be deducting downtime losses from your paychecks.

Technical Bulletin HI09-76PPI[]

Transcript

Loading...

Transcript

Technical Bulletin HI09-76PPI
From: Don Mobley, Lead Tech Hornwright Industrial
Code: HI09-21ABR
Severity: Orange

Due to increasing demand from headquarters, we're adding a third shift (11PM-7AM). Full twenty-four hour operation of the Rockhound requires that the wheel buckets get changed every three days. Please adjust your schedules accordingly. Failure to comply will result in immediate termination as per Hornwright Employee Agreement R/768ALI-091PRSN.

Advertisement