Fallout Wiki
Register
Advertisement
Fallout Wiki

The Vault 94 terminal entries are a series of entries found on terminals at Vault 94 in Fallout 76, introduced in the Nuclear Winter update.

Current layout[]

Community center terminal[]

FO76 V94 Community Center Terminal

Note: This desk terminal is located on a table in the lower level of the atrium. Antonio's holotape is inserted into it, and can be retrieved.

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 COMMUNITY TERMINAL |
=================================================
    Welcome! Thank you for visiting Vault 94.
=================================================

Please select an option:

Declaration of Emergency[]

Transcript

=====Vault-TechIn-game spelling, punctuation and/or grammar Vault Emergency Management Alert=====

Thank you for visiting Vault 94. A declaration of emergency has been issued and normal access control procedures have been suspended.

A Vault-Tec Certified Emergency Response Team has been activated and is en route. The team leader may override normal security protocols once the emergency has been verified.

Please contact a Vault Ambassador or any resident in order to ensure that all of our guests are safe and accounted for.

Transcript

Access...In-game spelling, punctuation and/or grammar

Welcome Letter[]

Transcript

=================================================
| Welcome to VAULT 94 |
=================================================

FROM THE PASTOR'S DESK:

Greetings, and Welcome to Vault 94!

On behalf of the Vault 94 intentional community, it is my pleasure to welcome you to our home. Vault 94 is founded on the principles of faith, nonviolence, and communal life in harmony with nature. Whether you share our beliefs or choose to walk your own path, know that you are always welcome among us.

Vault 94 was blessed with an abundance of resources, and we are committed to sharing them with all in need as we work together to restore the bounty of the Earth. More importantly, we hope to share our values and rebuild a common belief in the essential goodness of humanity.

If you are hungry, come and eat. If you are weary, come and rest. If you are here to trade, our stores are always open. Welcome to Vault 94. Welcome home.

--Pastor Gabriella Salavar

P.S. Please check any weapons or explosives at the reception desk as you enter.

Transcript

Access...In-game spelling, punctuation and/or grammar

Vault 94 Purpose[]

Note: Due to a bug, this option opens the same sub-terminal as the Community Bulletin Board.

Community Bulletin Board[]

Transcript

=================================================
| VAULT 94 COMMUNITY BULLETIN BOARD |
=================================================

Please ChooseIn-game spelling, punctuation and/or grammar from the following options:

Transcript

Access...In-game spelling, punctuation and/or grammar

Community Calender[]

Transcript

EVENTS SCHEDULE FOR:

[11/20/78]

06:00-07:00 - Sunrise Service, Upper Atrium
10:00-17:00 - Sharing Market, Upper Atrium
12:00-17:00 - Ambassadors & Guests Expected
12:00-17:00 - Vault Tours for Guests
12:00-13:00 - Community Council Special Session
17:00-18:00 - Potluck Dinner, Atrium
18:00-19:00 - Breakdown of Sharing Market

Transcript

Accessing...

Scheduled Lectures[]

Transcript

MONTHLY LECTURE SERIES:

This month's lecture topic will be:

PEACE & JUSTICE
11/4 - Out of the Ark: Founding a World of Peace
11/11 - Ethical Conflict Resolution Strategies
11/18 - Charity: Giving the Joy of Joyful Giving
11/25 - Thanksgiving as a Practice for Inner Peace

All talks are held in the Residential Wing Lecture Hall on Fridays at 7pm and all are invited to attend.

Transcript

Accessing...

Parenting Discussion Group[]

Transcript

PARENTING DISCUSSION GROUP:

Join us on Tuesdays from 2-4:00 in the Residential Wing Lounge for a welcoming, supportive dialogue on the joys of raising small children.

Cocktails will be served.

Transcript

Accessing...

Lost and Found Bulletin[]

Transcript

LOST TOY:

has anyone seen mr scuffy? paul says he put him back in the playspace, but i haven't seen him all morning. please help. -ruth

Transcript

Accessing...

Message from Maintenance[]

Transcript

MAINTENANCE ISSUES:

I know there have been a lot of issues over the past few weeks. Believe me, I'm just as frustrated as you are. But not everything is an emergency. Please don't wake me for another stopped toilet. Drop off a work order and I'll get it sorted.

IN CASE OF ACTUAL EMERGENCY, call for me over the PA System. If the PA is down again, look for me:
- In my room. (Suite A, Room 2)
- In the Community Council Chamber.
- In the Nursery, on the upper level.
- In the Workroom, on the upper level.

Tyrone Hayes
Maintenance Engineer

Transcript

Accessing...

Community Council terminal[]

FO76 Vault 94 (Community Council Terminal)

Note: This desk terminal is located on a table against the wall of the Community Council chambers. The holotape Vault 94 Community Council recording is inserted into it, and can be retrieved.

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 COMMUNITY COUNCIL |
=================================================
Current Security Level:
     Security Level N/A
Current Members of the Community Council:
     Current Number N/A
=================================================

Please select an option:

Vault 94 Community Documents[]

Transcript

=================================================
| VAULT 94 COMMUNITY COUNCIL |
=================================================
Current Security Level:
     Security Level N/A.

             Select a document to view:
=================================================

Transcript

Accessing...

Vault 94 Overview[]

Transcript

VAULT 94 OVERVIEW

Welcome to Vault 94!

Thank you for accepting our invitation to be a part of the Vault-Tec Societal Preservation Program. Vault 94 has been developed to respect the values and beliefs of your intentional community, as outlined in the documents submitted with your application.

- FAITH. With the exception of one (1) Vault-Tec Maintenance Engineer, all invited residents of this Vault are members of your congregation.
- NONVIOLENCE. No weapons or ammunition has been provided, nor have any turrets or other defensive systems been installed. All robots have been locked to a nonviolent conflict resolution mode.
- COMMUNAL LIFE. Living Quarters have been clustered to create communal residential spaces instead of individual residences. A Community Council model of government (see COMMUNITY GOVERNANCE) will encourage dialogue and consensus-building among residents.
- ECOLOGICAL HARMONY. Vault 94 houses extensive agricultural facilities. You are encouraged to use these for the benefit of your community and any other survivors of a nuclear apocalypse (see MISSION & FACILITIES).

Transcript

Accessing...

Vault 94 Community Governance[]

Transcript

VAULT 94 COMMUNITY GOVERNANCE

In keeping with your community's values and beliefs, Vault 94 has not been assigned an Overseer. Instead, your Vault is to be governed by a Community Council composed of the residents. All Vault Residents are encouraged to attend and participate in Community Council sessions.

A terminal in the Community Council Chamber will automatically record the minutes and motions before the Council. The Council is encouraged to operate by consensus, and consensus will be presumed unless otherwise indicated. Motions related to Vault Security will require a formal vote, which may be conducted by swiping your Vault ID Cards in the card readers located in the Council Chamber.

Transcript

Accessing...

Vault 94 Mission & Facilities[]

Transcript

VAULT 94 MISSION & FACILITIES

In the event of global nuclear war, multiple mass extinction events are anticipated. The primary mission of Vault 94 is to monitor and stabilize the local ecosystem, and to assist survivors outside the Vault (if any) with their agricultural needs.

To that end, Vault 94 has been equipped with a complete agricultural research facility, including experimental greenhouses, aquaculture labs, and a comprehensive seed bank containing all known plants suitable for edible or medicinal use.

To prevent damage to the seed bank, your Vault Door will automatically seal when external radiation reaches unsafe levels. The Vault Door may be reopened at your discretion after a mandatory minimum shelter period of one year. Vault Residents are encouraged to work with other survivors (if any) to assess the state of the environment and work to improve it.

Vault 94 has also been selected to receive a Garden of Eden Creation Kit (G.E.C.K.) module. In the event of catastrophic environmental devastation, your G.E.C.K. may be the best hope for the survival of humanity. As a security precaution, and to prevent premature use or misuse, the G.E.C.K. has been sealed in a self-contained secure wing of the Vault. Access to the G.E.C.K. Wing requires special authorization from the Vault 94 Community Council.

Transcript

Accessing...

Propose a Motion[]

Transcript

=================================================
| VAULT 94 COMMUNITY COUNCIL |
=================================================

ERROR: Due to the current state of emergency, no new motions may be proposed at this time.

=================================================
Recent Motions:

Transcript

Initiating...

Motion: G.E.C.K. Wing Access[]

Transcript

The motion 'G.E.C.K. Wing Access' has been proposed.

In accord with Vault-Tec security regulations, access to the G.E.C.K. Wing may only be authorized when the Vault is operating under normal security conditions (Security Level 1).

ERROR: 0x901 - SECURITY EXCEPTION:
     Current Security Level is: N/A

In accord with the Vault 94 Community Governance Charter, security operations requires a vote of registered Vault Residents.

The Vault 94 Community Governance will reconvene on the matter of reducing the Security Level once a motion is in place and approved or denied by consensus.

Transcript

Processing Motion...

Motion: Reduce Security Level[]

Transcript

The motion 'Reduce Security Level' has been proposed and accepted.

In accord with the Vault 94 Community Governance Charter, security operations requires a vote of registered Vault Residents.

The total number of votes required to reduce the Security Level has been reached. Voting has closed on this matter.

The Vault 94 Community Governance, no objections being noted, moves that this motion is approved by consensus.

Transcript

Processing Motion...

Motion: End Lockdown: Residential Wing[]

Transcript

The motion 'End Lockdown: Residential Wing' has been proposed and denied.

In accord with the Vault 94 Community Governance Charter, security operations requires a vote of registered Vault Residents.

The total number of votes required to conclude the lockdown of the residential wing has not been reached. Voting has closed on this matter.

The Vault 94 Community Governance moves that this motion is denied by consensus and that said lockdown will stay in effect.

Transcript

Processing Motion...

Motion: End Lockdown: Engineering Wing[]

Transcript

The motion 'End Lockdown: Engineering Wing' has been proposed and denied.

In accord with the Vault 94 Community Governance Charter, security operations requires a vote of registered Vault Residents.

The total number of votes required to conclude the lockdown of the Engineering Wing has not been reached. Voting has closed on this matter.

The Vault 94 Community Governance moves that this motion is denied by consensus and that said lockdown will stay in effect.

Transcript

Processing Motion...

Motion: End Lockdown: Agriculture Wing[]

Transcript

The motion 'End Lockdown: Agriculture Wing' has been proposed and accepted.

In accord with the Vault 94 Community Governance Charter, security operations requires a vote of registered Vault Residents.

The total number of votes required to conclude the lockdown of the Agricultural Wing has been reached. Voting has closed on this matter.

The Vault 94 Community Governance, no objections being noted, moves that this motion is approved by consensus.

Transcript

Processing Motion...

Historical Motions[]

Transcript

HISTORICAL MOTIONS
Displaying 10 important motions considered by the Council. For access to additional records, please contact the Community Council Secretary.

10/09/78
462: Special Service of Commemoration for War Victims
---Motion PASSED, CONSENSUS

10/16/78
463: Vault Ambassador Program
---Motion PASSED, 10-1-0
464: Nominations for Vault Ambassador Program
---Motion PASSED, 10-0-1

10/30/78
465: Security Preparedness/Self-Defense Training
---Motion FAILED, 1-10-0
466: Establish Emergency Planning Task Force
---Motion FAILED, 1-9-1
467: November Peace & Justice Lecture Schedule
---Motion PASSED, CONSENSUS

11/06/78
468: Update Conflict De-Escalation Dialogue
---Motion PASSED, CONSENSUS

11/13/78
469: Motion to Recall Ambassadors, Seal Vault
---Motion FAILED, 1-10-0
470: Proposed Welcome Day Program for Visitors
---Motion PASSED, 10-1-0

11/20/78
471: G.E.C.K. Wing Access
---Motion PASSED, CONSENSUS

Transcript

Accessing...

Decontamination control terminal[]

Note: This white console terminal is located in the room north of the reactor, positioned against a window looking into the decontamination area. It requires Hacker rank 1. There are no options to select on the terminal.

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 DECONTAMINATION CONTROL STATION |
=================================================

Exterior security terminal[]

FO76 V94 Exterior Terminal

Note: This desk terminal is located inside the blue security pod at the exterior of the Vault.

Transcript

===============Welcome to Vault 94===============
|Vault Status: NORMAL |
=================================================

Security Log - 10/21/77[]

Transcript

SECURITY LOG
Date: 10-21-77
User: Tyrone Hayes, Maintenance Engineer

At 09:30 this morning, we received the decryption keys to unseal the new orders for Vault 94. The other members of the Vault staff completed their assignments and have departed for Vault-Tec University, leaving me here alone.

As instructed, I contacted the invited residents, Pastor Salavar and her congregation, and informed them that Vault 94 is ready to receive them should the worst occur.

Transcript

Accessing Log...

Security Log - 10/23/77[]

Transcript

SECURITY LOG
Date: 10-23-77
User: Tyrone Hayes, Maintenance Engineer

As soon as the signal came in, I called the pastor and urged her to leave for the Vault at once. She should be arriving with the first wave of residents within the hour. A second bus is due later this afternoon. I'm heading in to make sure everything is ready for their arrival, and to see if I can stall the door a little longer.

Transcript

Accessing Log...

User Log - 10/24/78[]

Transcript

USER LOG
Date: 10-24-78
User: Maria Collins, Greeter

The Vault reopened yesterday afternoon. Pastor Gabriella led us in prayer for the victims of the war, then gave her blessing to the Ambassadors being sent forth on their missionary work.

I volunteered to take a shift here to make sure any visitors who come by are properly welcomed to our community. I also hope to set up a garden so we can begin testing some of our crops next spring. We need to understand what the Earth is still fit to nurture if our work is to be of use to others.

Transcript

Accessing Log...

G.E.C.K. monitoring station terminal[]

FO76 Vault 94 GECK monitoring stations

Note: This black console terminal is located in the Vault's G.E.C.K. wing, in the central room with the G.E.C.K. itself. The Vault 94 G.E.C.K. recording holotape is inserted into it, and can be retrieved.

Transcript

=================================================
| VAULT 94 G.E.C.K. MONITORING STATION |
=================================================
|G.E.C.K. Core Status: *UNAVAILABLE* |
|Cold Fusion Generator: *NOMINAL* |
|Replicator: *ERROR* |
|Containment Vessel: *UNAVAILABLE* |
=================================================
|ERROR: Unable to connect to systems |
=================================================

Introduction to the G.E.C.K.[]

Transcript

INTRODUCTION TO THE G.E.C.K.
The Garden of Eden Creation Kit (G.E.C.K.) is Vault-Tec's newest and most advanced survival technology. Developed by Doctor Stanislaus Braun, Director of Vault-Tec's Societal Preservation Program, the G.E.C.K. is a fully self-contained terraforming module capable of creating and sustaining life, even amid a desolate nuclear wasteland.

The G.E.C.K. includes a cold-fusion power generator rated to last at least 1000 years, matter-energy replicators, water purifiers, atmospheric chemical stabilizers, and seed and soil supplemementsIn-game spelling, punctuation and/or grammar. Even in the event of total global annihilation, a properly functioning G.E.C.K. will create an earthly paradise.

Transcript

Retrieving file...

G.E.C.K. System Log[]

Transcript

G.E.C.K. SYSTEM LOG

3/1/77: Log initialized.
3/1/77: G.E.C.K. Wing Construction Complete
6/11/77: G.E.C.K. Installation Completed.
6/11/77: Dormant Mode Activated
11/20/78: G.E.C.K. Wing Access Authorized
11/20/78: G.E.C.K. Containment Vessel Opened
11/20/78: Catastrophic Damage Detected
11/20/78: G.E.C.K. Fusion Generator Meltdown, resulting in Level-6 Nuclear Event.
11/20/78: Radiation surge measured at 7800 Rad/s. Significant mutations expected for any surviving organisms within the affected area (est. 5.5km)
11/20/78: Log terminated.

Transcript

Accessing Log...

GECK Containment Seal Controls[]

Transcript

=================================================
| G.E.C.K. CONTAINMENT CONTROLS |
=================================================
Containment Status: UNAVAILABLE

Accessing G.E.C.K. Containment Interlink...
...ERROR: UNABLE TO CONNECT TO INTERLINK...
Verifying G.E.C.K.ContainmentIn-game spelling, punctuation and/or grammar Integrity...
...ERROR: FAILED VERIFICATION...
Initiating G.E.C.K. Containment Procedure...
...ERROR: SYSTEM IS OFFLINE - Please wait...

The G.E.C.K.ContainmentIn-game spelling, punctuation and/or grammar Systems are currently unresponsive. Please consult documentation and contact Vault-Tec for technical support.

Transcript

Accessing...

Removed entries [Vault raids][]

Containment Vessel Controls[]

Transcript

Accessing...

Release G.E.C.K. Wing Seals[]
Transcript

Confirming Authorization...
...done.
Accessing G.E.C.K. Wing Seals...
...done.
Releasing Seals...
...done.

Transcript

Accessing...

Activate Containment Vessel[]
Transcript

Accessing Containment Vessel Interlink... done.
Verifying Containment Vessel Integrity... done.
Closing the Containment Vessel... In Progress.

Please wait while the Containment Vessel is sealed.

Transcript

Accessing...

Export Audio Recording - 11/20/78, 17:51[]

Transcript

Exporting G.E.C.K. Audio Log for 11/20/78...
...done.

Transcript

Accessing...

Greenhouse control terminal[]

FO76 V94 GreenhouseTerminal 1
FO76 V94 GreenhouseTerminal 2
FO76 V94 GreenhouseTerminal 3

Note: There are two of these console terminals. One is on the lower level of the greenhouses, outside of Greenhouse 1, while the other can be found in the control room on the upper level of the greenhouses.

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE |
=================================================

For the safety and well-being of our community, all research experiments require prior approval from the Vault 94 Community Council. All data collected and stored will be made freely available to all upon request.

Community Garden Request[]

Transcript

There has been interest within the vault to have a community garden that can be shared with our visitors. The Council has agreed and thinks this would help to build and maintain a sense of community. Others disagree, and we have seen a few "spirited" arguments that have all been handled peacefully using the nonviolent conflict resolution protocol.

A proposal is now in place, stating that location is the primary concern. Waiting to hear from the Council in order to proceed.

Transcript

Accessing...

EXPERIMENTS DATABASE ARCHIVE[]

Transcript

=================================================
| VAULT 94 Greenhouse Database |
=================================================

ACTIVE EXPERIMENTS DATABASE:
Number of Current Active Experiments: N/A

Transcript

Accessing...

Experiment CR.11-XH[]

Transcript

ACTIVE EXPERIMENT:
Type-III Crop Hybridization

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment CR.67-XH[]

Transcript

ACTIVE EXPERIMENT:
Type-IV Experimental Hybridization

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment RA.06-XS[]

Transcript

ACTIVE EXPERIMENT:
Mutational Load Acquisition from Radioactive Soil

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment DT.29-XT[]

Transcript

ACTIVE EXPERIMENT:
Selection for Drought Tolerance Characteristics

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment WR.95-IU[]

Transcript

ACTIVE EXPERIMENT:
Isotope Uptake from Radioactive Groundwater

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment WV.03-RF[]

Transcript

ACTIVE EXPERIMENT:
Rainfall Variability Impact Study

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment GP.85-XG[]

Transcript

ACTIVE EXPERIMENT:
Contaminant Impact on Germination Potential

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment XT.81-SA[]

Transcript

ACTIVE EXPERIMENT:
Environmental Toxicity: Survival Assessment

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment RC.21-CH[]

Transcript

ACTIVE EXPERIMENT:
Resource Competition in Crowded Habitats

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Experiment SC.75-IS[]

Transcript

ACTIVE EXPERIMENT:
Secondary Chemical Impact Study

RESEARCH PROTOCOL:
ERROR - Data corrupted

RESEARCH REQUIREMENTS:
ERROR - Data Unavailable. Inform Agriculture Wing Supervisor to resolve issue.

Operations center terminal[]

FO76 Vault 94 (Operations Center Terminal)

Note: This black console terminal is located in the operations center, near the entrance to the G.E.C.K. wing.

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 OPERATIONS CENTER |
=================================================
| EMERGENCY SYSTEM OFFLINE |
| |
| Internal Sensors: UNAVAILABLE |
| Radiation Level: UNAVAILABLE |
| |
=================================================

ERROR: All systems are unavailable

Activate Internal Sensors[]

Transcript

Accessing Internal Sensor Network...
...ERROR: UNABLE TO CONNECT...

Unable to Activate Sensors at this time...
The G.E.C.K. Wing Systems are currently unresponsive. Please consult documentation and contact Vault-Tec for technical support.

G.E.C.K. Wing Access Controls[]

Transcript

=================================================
| VAULT 94 G.E.C.K. WING ACCESS CONTROLS |
=================================================

| G.E.C.K. WING ACCESS ERROR: UNAVAILABLE |

=================================================

Access to the G.E.C.K. Wing awaiting authorization from the Vault 94 Community Council.

ERROR: The Authorization System is offline...
...Please stand by...

Release G.E.C.K. Wing Seals[]

Transcript

Confirming Authorization...
...ERROR: AUTHORIZATION SERVICES OFFLINE...

Accessing G.E.C.K. Wing Seals...
...Seals Released...

G.E.C.K. Wing Access...
...Currently Accessible...

Reactor monitoring station terminal[]

FO76 Vault94 (Reactor Monitoring Station Terminal)

Note: There are four of these red console terminals. They are all located on the second level of the reactor room, with two on each side of the balconies (west and east sides).

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 REACTOR MONITORING STATION |
=================================================
==============REACTOR SYSTEM STATUS==============
|Current Procedure: -NONE-
|Primary Reactor: NOMINAL
|Secondary Reactor: INACTIVE
=================================================

Reactor System Overview[]

Transcript

VAULT 94 REACTOR SYSTEM OVERVIEW

Vault 94 has been supplied with one (1) Class-VI fusion reactor (designated 'Primary') and one (1) Class-VIb fusion reactor (designated 'Secondary'). These reactors will supply a stable power source with an operational lifespan of 200+ years. Automated procedures required to manage these reactors will be administered by the Vault Mainframe. Written documentation is not available.

Two (2) Class-VIII Reactors have been installed in the G.E.C.K. Wing on a closed circuit. These reactors are reserved for use by the G.E.C.K. containment and control systems.

Reactor Subsystem Restart Procedure[]

Transcript

=================================================
| VAULT 94 REACTOR MONITORING STATION |
=================================================

VX-5 EMERGENCY RESTART PROCEDURE:

Restart Procedure not required at this time.

Instructions will be provided in the event of a failure.

Reception desk terminal[]

FO76 V94 Security ReceptionDeskTerminal
Transcript

Welcome to ROBCO Industries (TM) Termlink

===============Welcome to Vault 94==============
|Vault Status: FAILED TO VALIDATE STATUS
================================================
           Please Select an Option:

View Logs[]

Transcript

===============Welcome to Vault 94==============
|Vault Status: FAILED TO VALIDATE STATUS
================================================

RECEPTION DESK LOG
Please select a log to view:

Security Log - 10/21/77[]

Transcript

SECURITY LOG
Date: 10-21-77
User: Nathan Simms, Vault-Tec Security

Per orders from Vault-Tec, I've wiped the old security logs. We're shipping out this afternoon.

Best of luck to the new residents. Not that they'll need it. This place is loaded.

Security Log - 10/23/77[]

Transcript

SECURITY LOG
Date: 10-23-77
User: Tyrone Hayes, Maintenance Engineer

Pastor Salavar and the first residents arrived around noon, just as radiation started climbing. I tried throwing some tarps over the sensors to tamp them down, but the failsafe tripped around 1:30, and the Vault Door locked down.

The other bus didn't make it until 3:00. There was nothing I could do; the system's hardwired to lock out the controls until the end of the shelter period. Everyone's in shock. Salavar blames me. I think they all do. God, I can still hear them pounding outside the door.

Reception Log - 10/28/78[]

Transcript

RECEPTION LOG
Date: 10-28-78
User: Mike Ramirez, Usher

Pastor asked me to take charge of the office up here, set up a proper reception desk. Took me a couple of days to get the place cleaned up and install the lockers for a weapons check, but I think it's all in order now. Not expecting any visitors for a couple of weeks yet, but you never know.

In the meantime, I got plenty of time to work on my crosswords.

Reception Log - 11/20/78[]

Transcript

RECEPTION LOG
Date: 11-20-78
User: Mike Ramirez, Usher

First visitors showed up a little before noon today, right on schedule. Rough looking bunch. Things must be real bad out there.

They wanted to know who was in charge, so I sent them down to meet with the Council. They blew right by the weapons check. Shame, after all the work I went through to set up the lockers.

Vault Door Controls[]

Transcript

===============Welcome to Vault 94==============
|Vault Status: FAILED TO VALIDATE STATUS
================================================
           Please Select an Option:

Vault Door Control Instructions[]

Transcript

VAULT-TEC VAULT DOOR SYSTEM
SPECIAL INSTRUCTIONS - VAULT 94

Refer your Vault-Tec Security Manual for complete operating instructions. The following special instructions supercede the indicated paragraphs for this Vault only.

16.2.2.7. Automatic Closure:
The Vault 94 Vault Door has been linked to the Vault's external radiation sensors. The door will automatically close once radiation outside the Vault reaches levels consistent with a significant nuclear event. Once closed, the door cannot be reopened by any means until the mandatory one-year shelter period has elapsed.

16.2.7.1. Vault Door Access Interface:
Due to the unique nature of Vault 94's community and mission, the Vault 94 Community Council has been empowered to determine a course of action and how to proceed once the mandatory shelter period has expired.

All further inquires into Vault Door Access for this vault should be deferred to the Vault 94 Community Council.

Close Vault Door[]

Transcript

Accessing Vault Door Control Interlink...
...failed.

ERROR: Due to the current state of emergency, Vault Door controls have been overridden by the Emergency Management System.

Open Vault Door[]

Transcript

Accessing Vault Door Control Interlink...
...failed.

ERROR: Due to the current state of emergency, Vault Door controls have been overridden by the Emergency Management System.

Emergency Management System[]

Transcript

=================================================
| VAULT 94 EMERGENCY MANAGEMENT SYSTEM |
=================================================

Welcome to the Vault 94 Emergency Management System. Please review all documentation and become familiar with all operational procedures and protocols prior to interfacing and activating the system.

ALERT NOTIFICATION[]

Transcript

EMERGENCY NOTIFICATION ALERT:

The Emergency Management System has detected multiple complications and has issued a declaration of emergency.

A Vault-Tec Certified Emergency Response Team has been activated and is en route. The team leader may override normal security protocols once the emergency has been verified.

ERROR:
...The Emergency Management System is offline...
...Please stand by...
...assistance may be required...
...RESOLUTION PROTOCOL:
   - Evacuate the Vault.

Emergency Management System Documentation[]

Transcript

=================================================
| VAULT 94 EMERGENCY MANAGEMENT SYSTEM |
=================================================

Select a document to view:

Overview[]
Transcript

VAULT-TEC EMERGENCY MANAGEMENT SYSTEM: AN OVERVIEW

Congratulations! Your Vault has been equipped with the latest automated emergency response technology: the Vault-Tec Emergency Management System.

The Emergency Management System is a comprehensive database of automated contingency protocols developed to assist Overseers, Vault Residents, and (when/if available) Certified Vault-Tec Emergency Responders in identifying, diagnosing, and resolving a wide array of potential emergency situations.

Using the Emergency Management System[]
Transcript

USING THE EMERGENCY MANAGEMENT SYSTEM:

In the unlikely event of an emergency, your Vault Mainframe will automatically assess the situation and select an appropriate error resolution protocol from the Emergency Management System database. Populated by thousands of programs submitted by Vault-Tec University's talented undergraduate students, your database holds the solution to any problem.

When applicable, your Vault may broadcast an emergency transmission to any Vault-Tec personnel in the area. Response times in the aftermath of a nuclear conflict may vary.

The emergency response team leader should use any available terminal to activate the Emergency Management System and indicate their team's level of expertise. This will calibrate the protocol and adjust applicable hazard pay or bonuses, if any.

Thereafter, simply follow the audible instructions from the Vault Mainframe. The Mainframe will continually monitor the situation and introduce additional contingencies as required.

Example Protocol: Catastrophic Flooding[]
Transcript

VAULT-TEC EMERGENCY MANAGEMENT SYSTEM:
ERROR CODE: [FC-855] Catastrophic Flooding

SUMMARY PROTOCOL:
- Locate, Seal or Repair Rupture.
- Protocol Method Unavailable...
- Activate Emergency Flood Control Procedure K-52.

STUDENT DEVELOPER: Yeates, Kylee (VP205, 2074)
DEVELOPER NOTES:
- This protocol identifies the safest route through the Vault, assesses the flooding in each successive section along this route, and directs repairs as needed to drain them and allow the team to proceed.
- Secondary protocols address contingencies including pump, reactor, and structural failure, ventilation issues, and resident evacuation.

PROFESSOR: DeMarcos, E.
GRADE: B+
REMARKS: A competent protocol that appropriately handles most major contingencies. Notable flaws include an overly cautious pathing algorithm (simulations suggest unnecessarily circuitous route selection), a tendency to overstress Flood Control Pumps with excessive drainage, and an inability to reset the pumps automatically.

Example Protocol: Nuclear Incident[]
Transcript

VAULT-TEC EMERGENCY MANAGEMENT SYSTEM:
ERROR CODE: [RZ-504] Nuclear Incident

SUMMARY PROTOCOL:
- Proceed to the Operations Center.
- Identify the source of the radiation.
- Neutralize the threat.

STUDENT DEVELOPER: Michaels, Ted (VP101, 2076)
DEVELOPER NOTES:
- This protocol relies on the Vault's internal sensors to sample radioactive isotopes at multiple points, then applies a gradient heuristic to identify the source of the radiation and propose a resolution.
- Supported radiation sources include nuclear detonation (external or internal), fusion core cascade failures, reactors, and a G.E.C.K.

PROFESSOR: DeMarcos, E.
GRADE: C
REMARKS: Adequate but uninspired work for a 100-level course. While generally successful at basic containment, this protocol fails to address potential secondary contingencies and may leave the emergency response team without sufficient guidance to address them. In particular, its inability to override security seals of Class-III or above may prove problematic if the source of the radiation is in a secure area. Still, no worse than all the other student submissions for this error code.

Example Protocol: Containment Breach[]
Transcript

VAULT-TEC EMERGENCY MANAGEMENT SYSTEM:
ERROR CODE: [AX-481] Containment Breach

SUMMARY PROTOCOL:
- Protocol Method Unavailable...
- Activate Emergency Flooding Procedure M-09.
- Evacuate the Vault.

STUDENT DEVELOPER: Lanning, Jim (VP205, 2077)
DEVELOPER NOTES: -NONE-

PROFESSOR: DeMarcos, E.
GRADE: F
REMARKS: This program does not crash immediately.

Regrettably, that is its only positive characteristic. While completely flooding a Vault would doubtless be effective at dealing with containment breach of the vault seals (or virtually anything else), the extreme and potentially irreversible nature of this solution should have made it a last resort. Instead, this protocol opts for it immediately. It then fails to provide sufficient time for Vault Residents to evacuate, fails to safely shut down Vault Systems or override safeguards that could impede the evacuation, and fails to verify that bulkhead doors located along the evacuation route are even open. An evacuation might be successful if the Residents aggressively damage the flood control system to delay the procedure, but Vault-Tec does not typically encourage Residents to destroy their Vault.

Unfortunately, this is the only extant submission for this particular error code. Recommend soliciting a replacement from this Fall's class.

Activate Emergency Management System[]

Transcript

=================================================
| VAULT 94 EMERGENCY MANAGEMENT SYSTEM |
=================================================

ERROR:
...The Emergency Management System is offline...
...Please stand by...
...assistance may be required...

ERROR: Only Vault-Tec Certified Emergency Response Team leaders are authorized to activate this system.
ERROR:...hazard pay is dependant on...
...System Error Codes (0-V13) (0x0-0x1f1)

ACTIVATE EMERGENCY MANAGEMENT SYSTEM?[]
Transcript

Activating Emergency Management System...
...ERROR: Can not connect.
Loading Emergency Management Protocol...
...ERROR: Protocols Unavailable.
Loading Resolution Protocol Parameters...
...RUNTIME ERROR - '20141(84015) -Unexpected condition from subroutine- Solver Failed...
...Terminating System.
The Emergency Management System is unresponsive. Please consult documentation and contact Vault-Tec for technical support.

EMERGENCY MANAGEMENT SYSTEM: STATUS[]
Transcript

System Response Analysis:

Emergency Management System Assessment...
...ERROR: Can not connect - System is unresponsive..

Evaluating:
Emergency Management Protocol Services...
...ERROR: Can not connect - System is unresponsive..
Resolution Protocol Parameter Services...
...ERROR: Can not connect - System is unresponsive..

The Emergency Management System is currently experiencing complications. Please consult documentation and contact Vault-Tec for technical support.

Seed bank management terminal[]

Note: There are two of these black console terminals. They can be found in two corners of the seed bank control room.

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| SEED BANK MANAGEMENT TERMINAL |
=================================================
|Vault Status: EMERGENCY |
|Seed Bank Status: ERROR |
=================================================

View Seed Bank Errors[]

Transcript

ERROR: MISSING SAMPLE CANISTERS DETECTED
Multiple Seed Banks have failed to seal because their requisite sample canisters are missing. Replace the samples or initiate a manual override from their respective control terminals.

ERROR: UNABLE TO CONNECT TO SEED BANKS ARRAY
ATTEMPTING RECONNECTION...

ERROR: UNABLE TO CONNECT TO SEED BANKS ARRAY
ATTEMPTING RECONNECTION...

ERROR: UNABLE TO CONNECT TO SEED BANKS ARRAY
FAILED TO CONNECT...

Transcript

Accessing...

Seed bank override terminal[]

Note: There are two of these black console terminals. One can be found on the southeastern side of the main seed bank room, while the other can be found against the north-central side of the seed bank.

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| SEED BANK OVERRIDE TERMINAL |
=================================================
|Vault Status: EMERGENCY |
|Seed Bank Status: ERROR |
=================================================

ERROR: MISSING SAMPLE CANISTERS DETECTED
One or more Seed Banks connected to this terminal have failed to seal. In the event of an emergency, authorized personnel may override this error and force all connected seed banks to seal.

Manual Override: Seal Seed Banks[]

Transcript

ERROR: Unable to connect to Seed Banks Array...
ERROR: Unable to connect to Management Terminal...
ERROR: Unable to initiate manual override...

All seed banks connected to this terminal are unresponsive. Override is unavailable at this time. This issues has been logged, and will be reported to the Agriculture Wing Supervisor.

Transcript

Processing...

Tyrone Hayes' terminal[]

FO76 Vault 94 (Tyrone Hayes' Terminal)

Note: This desk terminal can be found in the northeastern corner of the engineering room.

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 MAINTENANCE TERMINAL |
| Tyrone Hayes, Maintenance Engineer |

=====================================[]

Maintenance Codes[]

Transcript

=================================================
| VAULT 94 RESIDENTIAL TERMINAL |
| Tyrone Hayes, Maintenance Engineer |
=================================================

Welcome to the Vault-Tec MaintSecure System. Today's Maintenance Codes for your Vault are:

[GENERAL MAINTENANCE ACCESS CODES]

ALPHA: ERROR: Key Generator Not Found[0X006624v]
BETA: ERROR: Key Generator Not Found[0X006624v]
GAMMA: ERROR: Key Generator Not Found[0X006624v]
DELTA: ERROR: Key Generator Not Found[0X006624v]

Transcript

Decrypting...

Print Codes?[]

Transcript

Accessing printer...
...ERROR: Unable to Connect...
Printing codes...
...Canceled Job...

Unable to print your Maintenance Codes at this time...

Transcript

Now Printing...

Maintenance Logs[]

Transcript

=================================================
| VAULT 94 RESIDENTIAL TERMINAL |
| Tyrone Hayes, Maintenance Engineer |
=================================================

OPEN MAINTENANCE WORK ORDERS

Select a Work Order to View:

Work Order - [R-060022][]

Transcript

Work Order - [R-060022]:

 - All showers broken; low water pressure.

Work Order - [A-210001][]

Transcript

Work Order - [A-210001]:

- PA keeps blasting random static after midnight.

Work Order - [C-030021][]

Transcript

Work Order - [C-030021]:

- Disable Cafeteria smoke detector to prevent
  another 'false alarm' from Friday Fish Fry.

Work Order - [G-110012][]

Transcript

Work Order - [G-110012]:

- Greenhouse #3 flooded again. Get Maintenance
  Robots set up for continuous monitoring.

Work Order - [M-050020][]

Transcript

Work Order - [M-050020]:

- Recalibrate Ms. Maid to avoid dusting incidents.

Work Order - [T-040094][]

Transcript

Work Order - [T-040094]:

- Extract 'Mr. Scuffy' from reactor turbine
  blades; find replacement bear.

Personal Logs[]

Transcript

=================================================
| VAULT 94 RESIDENTIAL TERMINAL |
| Tyrone Hayes, Maintenance Engineer |
=================================================

PERSONAL LOGS
Please select a log to view:

VAULT 94 OVERSEER INSTRUCTIONS[]

Transcript

CONFIDENTIAL CONFIDENTIAL CONFIDENTIAL
OVERSEER EYES ONLY | VIOLATION VTP-01011

You have been selected as the special Overseer for Vault 94.

Vault 94 is designed to test the adaptability of ideological groups to changing social contexts. The selected residents are all members of an agrarian pacifist religious community, and are expected to reinforce that identity during the one-year shelter period. Thereafter, they have been encouraged to open the Vault to other survivors, who will likely be armed and desperate. Vault 94 has been allocated high-value resources, but no weapons or other defenses. The residents will need to modify their belief system, improvise, and adapt quickly in order to ensure their survival.

In order to minimize disruptions to their social order and avoid contaminating the experiment, you will be the sole representative of Vault-Tec in this Vault. You are to maintain your current assignment as a Vault-Tec Maintenance Engineer and minimize your interaction with the other residents. The Vault will be self-governing; you have no authority and are to avoid any role in their decision-making process.

Once the initial shelter period ends, you are to encourage the residents to reopen the Vault if they have not already done so. Observe the ensuing conflicts and report your findings using the secure channel provided.

VAULT-TEC SECURE CHANNEL[]

Transcript

Accessing Vault-Tec Secure Channel...
...failed.

ERROR: Connection failed. Please check your settings and reinitialize the connection.

Personal Log - 10/24/77[]

Transcript

PERSONAL LOG
Date: 10-24-77
User: Tyrone Hayes, Maintenance Engineer

I can't sleep. Can't shake the sound of them, pounding outside the Vault Door.

I went for a walk around 2am. Found the Pastor's daughter crying out in the Atrium. We talked for a while. She seems like a nice girl. She deserved better than this. We all did.

What the hell, Vault-Tec? I'm an engineer, not a secret agent. I mean, sure, grateful not to be dead and all, but I never signed on for this. I wish I'd never enrolled at VTU.

Personal Log - 11/2/77[]

Transcript

PERSONAL LOG
Date: 11-2-77
User: Tyrone Hayes, Maintenance Engineer

It's strange, being an outsider in a community like this. Everyone knows everyone else; they all just get along. They don't curse, don't argue, barely even raise their voices. Everyone's still in shock, but there hasn't been a single fight. It would be creepy, if it wasn't so nice.

Pastor Salavar is still pretty cold. She blames me for all the people who got locked out, even if she won't say so. But everyone else is polite, even if they keep their distance.

Personal Log - 1/14/78[]

Transcript

PERSONAL LOG
Date: 1-14-78
User: Tyrone Hayes, Maintenance Engineer

I've been spending more time with Angelique. She's working as an aide in the Nursery, and I've always liked kids. We get along pretty well. Her mother keeps hovering, though, or sending people to check up on us. She still doesn't trust me.

Personal Log - 3/6/78[]

Transcript

PERSONAL LOG
Date: 3-6-78
User: Tyrone Hayes, Maintenance Engineer

Another Sunday, another Community Council meeting. I was reluctant to go at first-- it is against the Instructions-- but they need the technical expertise, and refusing would just seem suspicious. So long as I don't speak up too much, I'm sure it'll be all right.

Personal Log - 5/29/78[]

Transcript

PERSONAL LOG
Date: 5-29-78
User: Tyrone Hayes, Maintenance Engineer

I was always pretty solitary growing up. Living in a community like this, it's been different. Wish I'd had friends like this years ago.
 
I've started going to morning services. I don't know that I believe it all, but it seems to work for them. Might as well go along.

Personal Log - 8/28/78[]

Transcript

PERSONAL LOG
Date: 8-28-78
User: Tyrone Hayes, Maintenance Engineer

Angelique and I are engaged. We announced it at the Council meeting this afternoon. Pastor Salavar didn't take it well, but everyone else was happy for us. Angelique says I should just give her time. She'll come around.

Personal Log - 10/5/78[]

Transcript

PERSONAL LOG
Date: 10-5-78
User: Tyrone Hayes, Maintenance Engineer

The shelter period ends in a couple of weeks. The Council's been debating Salavar's Ambassador Program, to send people out in search of survivors and invite them to the Vault. I've done everything I can to talk them out of it, but they won't listen. Whatever's out there, they aren't ready for it. The world's not going to be the same.

Vault-Tec expects them to crack, ditch their beliefs, fight to survive. But I know these people. I'm one of them now. They won't do it. And I don't want them to.

Personal Log - 10/16/78[]

Transcript

PERSONAL LOG
Date: 10-16-78
User: Tyrone Hayes, Maintenance Engineer

I came clean. I told the Council everything, but they wouldn't believe me. So I showed them the damn Instructions.

Salavar was smug; said she was right about me all along. And Angelique... I've never seen her look at me like that before. It was horrible.

The Ambassador program passed anyway.

Personal Log - 11/18/78[]

Transcript

PERSONAL LOG
Date: 11-18-78
User: Tyrone Hayes, Maintenance Engineer

The first Ambassadors are due back in a couple of days. Even now, we could seal the Vault and live here, safely, forever. Nothing has to change.

But they're convinced I'm wrong, that Vault-Tec was wrong. That whoever is left out there will finally understand the futility of war, that they'll be ready to listen, to live in peace.

I guess we'll see.

Vault access control terminal[]

FO76 V94 Access Terminal

Note: This console terminal is located on the first platform at the Vault's entrance, before going into the Vault itself.

Transcript

Welcome to ROBCO Industries (TM) Termlink

===============Welcome to Vault 94==============
|Vault Status: FAILED TO VALIDATE STATUS
================================================
           Please Select an Option:

Welcome Letter[]

Transcript

FROM THE PASTOR'S DESK:

Greetings, and Welcome to Vault 94!

On behalf of the Vault 94 intentional community, it is my pleasure to welcome you to our home. Vault 94 is founded on the principles of faith, nonviolence, and communal life in harmony with nature. Whether you share our beliefs or choose to walk your own path, know that you are always welcome among us.

Vault 94 was blessed with an abundance of resources, and we are committed to sharing them with all in need as we work together to restore the bounty of the Earth. More importantly, we hope to share our values and rebuild a common belief in the essential goodness of humanity.

If you are hungry, come and eat. If you are weary, come and rest. If you are here to trade, our stores are always open. Welcome to Vault 94. Welcome home.

--Pastor Gabriella Salavar

P.S. Please check any weapons or explosives at the reception desk as you enter.

Removed terminals[]

Note: The terminals in this section were previously accessible in the Vault as part of the Vault raids feature. They have since been removed from the layout of the vault and can no longer be found.

Common room terminal[]

Transcript

Welcome to ROBCO Industries (TM) Termlink

=================================================
| VAULT 94 RESIDENTIAL TERMINAL |
| SUITE A COMMON ROOM |
=================================================

Peace & Justice Lecture Series[]

Transcript

PEACE & JUSTICE LECTURE SERIES
This month's lecture topics will be:
11/4 - Out of the Ark: Founding a World of Peace
11/11 - Ethical Conflict Resolution Strategies
11/18 - Charity: Giving the Joy of Joyful Giving
11/25 - Thanksgiving as a Practice for Inner Peace

All talks are held in the Residential Wing Lecture Hall on Fridays at 7pm.

Lost Toy[]

Transcript

LOST TOY
has anyone seen mr scuffy? paul says he put him back in the playspace, but i haven't seen him all morning. please help. -ruth

Maintenance Issues[]

Transcript

MAINTENANCE ISSUES
I know there have been a lot of issues over the past few weeks. Believe me, I'm just as frustrated as you are. But not everything is an emergency. Please don't wake me for another stopped toilet. Drop off a work order and I'll get it sorted.

IN CASE OF ACTUAL EMERGENCY, call for me over the PA System. If the PA is down again, look for me:
- In my room. (Suite A, Room 2)
- In the Community Council Chamber.
- In the Nursery, on the upper level.
- In the Workroom, on the upper level.

Tyrone Hayes
Maintenance Engineer

Parenting Discussion Group[]

Transcript

PARENTING DISCUSSION GROUP
Join us on Tuesdays from 2-4:00 in the Residential Wing Lounge for a welcoming, supportive dialogue on the joys of raising small children.

Cocktails will be served.

Community Council terminal [Vault raids][]

Transcript

==========================================
Welcome to the Vault 94 Community Council!====================================
CURRENT MOTIONS:
<Token.Name=V94CCCurrentMotions>

CURRENT VOTES:
- NONE

Propose a Motion[]

Note: The text that was displayed depended on the progress of the current Vault Mission.

Transcript

ERROR: Due to the current state of emergency, no new motions can be accepted at this time. Please try again later.

Transcript

=================================================
| VAULT 94 COMMUNITY COUNCIL |
=================================================
ACTIVE VOTE:
[Reduce Security Level]
Yea: <Token.Value=V94VotesOverallCurrent> | Nay: 0 | Abstain: 0
Current Security Level: <Token.Value=V94CurrentSecurityLevel>
<Token.Value=V94VotesTargetCurrent>/<Token.Value=V94VotesTargetTotal> Votes required for Security Level <Token.Value=V94NextSecurityLevel>.
<Token.Value=V94VotesOverallCurrent>/<Token.Value=V94VotesOverallTotal> Votes required for Security Level 1.
=================================================

<Token.Name=V94ProposeMotionTerminalHeader>

Transcript

=================================================
| VAULT 94 COMMUNITY COUNCIL |
=================================================
ACTIVE VOTE:
[Reduce Security Level]
Yea: <Token.Value=V94VotesOverallCurrent> | Nay: 0 | Abstain: 0
Current Security Level: <Token.Value=V94CurrentSecurityLevel>
<Token.Value=V94VotesOverallCurrent>/<Token.Value=V94VotesOverallTotal> Votes required for Security Level 1.
=================================================

<Token.Name=V94ProposeMotionTerminalHeader>

Transcript

=================================================
| VAULT 94 COMMUNITY COUNCIL |
=================================================

<Token.Name=V94ProposeMotionTerminalHeader>

Motion: G.E.C.K. Wing Access[]

Transcript

ERROR: 0x901 - SECURITY EXCEPTION

The current Security Level is: <Token.Value=V94CurrentSecurityLevel>.

Due to Vault-Tec security regulations, access to the G.E.C.K. Wing may only be authorized when the Vault is operating under normal security conditions (Security Level 1). Resolve the current security incident(s), then try again.

Motion: G.E.C.K. Wing Access[]

Transcript

The motion 'G.E.C.K. Wing Access' has been proposed.

In accord with the Vault 94 Community Governance Charter, no objections being noted, this motion is approved by consensus.

Motion: Reduce Security Level[]

Transcript

The motion 'Reduce Security Level' has been proposed.

In accord with the Vault 94 Community Governance Charter, security operations require a vote of registered Vault Residents.

A total of <Token.Name=V94VotesTargetTotal> votes are required to reduce the Security Level by one step. Voting will remain open for 24 hours.

Motion: End Lockdown: Residential Wing[]

Transcript

The motion 'End Lockdown: Residential Wing' has been proposed.

<Token.Name=V94EndLockdownVoteResult>

Motion: End Lockdown: Engineering Wing[]

Transcript

The motion 'End Lockdown: Engineering Wing' has been proposed.

<Token.Name=V94EndLockdownVoteResult>

Motion: End Lockdown: Agriculture Wing[]

Transcript

The motion 'End Lockdown: Agriculture Wing' has been proposed.

<Token.Name=V94EndLockdownVoteResult>

Motion: End Lockdown: Pump Control Station[]

Transcript

The motion 'End Lockdown: Pump Control Station' has been proposed.

<Token.Name=V94EndLockdownVoteResult>

View Historical Motions[]

Transcript

Displaying the 10 most recent motions considered by the council. For access to additional records, please contact the secretary.

10/09/78
1162: 10/23 Special Service of Commemoration

Motion PASSED, CONSENSUS.

10/16/78
1163: Vault Ambassador Program

Motion PASSED, 10-1-0.
1164: Nominations for Vault Ambassador Program

Motion PASSED, 10-0-1.

10/30/78
1165: Security Preparedness/Self-Defense Training

Motion FAILED, no second.
1168: Establish Emergency Planning Task Force

Motion FAILED, no second.
1167: Approval for Peace & Justice Lecture Series

Motion PASSED, 10-0-1.

11/06/78
1166: Update Conflict De-Escalation Dialogue

Motion PASSED, 10-0-1.

11/13/78
1169: Motion to recall Ambassadors, seal Vault

Motion FAILED, no second.
1170: Proposed Welcome Day Program for Visitors

Motion PASSED, 10-1-0.

11/20/78
1171: G.E.C.K. Wing Access Authorization

Vote PASSED, 20-0-0

View Vault-Tec Documents[]

Vault 94 Overview[]

Transcript

VAULT 94 OVERVIEW

Welcome to Vault 94!

Thank you for accepting our invitation to be a part of the Vault program. Vault 94 has been developed to respect the core values of your intentional community, as outlined in the charter and supporting documents submitted with your application.

- FAITH. With the excpetionIn-game spelling, punctuation and/or grammar of one (1) Vault-Tec MaintainenceIn-game spelling, punctuation and/or grammar Engineer, all invited residents of this Vault are members of your congregation.
- NONVIOLENCE. No weapons, armor, or explosives have been supplied to this Vault, nor have any turrets or other defensive systems been installed. All robots have been locked toIn-game spelling, punctuation and/or grammar a nonviolent conflict resolution mode.
- COMMUNAL LIFE. Living Quarters have been clustered to create communal residential spaces instead of individual quarters. A Community Council model of government (see COMMUNITY GOVERNANCE) will encourage dialogue and consensus-building among residents.
- ECOLOGICAL HARMONY. Vault 94 has extensive agricultural facilities. You are encouraged to use these for the benefit of your community and any other survivors of the nuclear apocalypse (see MISSION & FACILITIES).

Vault 94 Community Governance[]

Transcript

VAULT 94 COMMUNITY GOVERNANCE

Vault 94 has not been assigned a Vault-Tec Overseer. Instead, this Vault is to be governed by a Community Council system. All Vault residents are encouraged to attend and participate in Community Council sessions.

This terminal has been provided to automatically record the minutes and motions before the Council. In the event that consensus on a proposal cannot be achieved, this terminal can also be used to conduct a community vote. Residents may vote by swiping their Resident ID Cards in the card readers to either side of this desk.

Vault 94 Mission & Facilities[]

Transcript

VAULT 94 MISSION & FACILITIES

In the event of global nuclear war, multiple mass extinction events are anticipated. The primary mission of Vault 94 is to monitor and stabilize the local ecosystem in the aftermath of such a war, and to assist other survivors outside the Vault (if any) with their needs.

To that end, Vault 94 has been equipped with a complete agricultural facility, including a comprehensive seed bank containing all known plants suitable for edible or medicinal use.

To prevent damage to the seed bank, Vault 94's Vault Door will automatically seal when external radiation reaches unsafe levels. The Vault Door may be reopened after a mandatory minimum shelter period of one year. Vault Residents are then encouraged to work with any survivors outside the Vault to assess the state of the environment and work to improve it.

Vault 94 has also been selected to receive a Garden of Eden Creation Kit (G.E.C.K.) module. In the event of catastophicIn-game spelling, punctuation and/or grammar environmental devestationIn-game spelling, punctuation and/or grammar, your G.E.C.K. may be the best hope for the survival of humanity in this region. In order to prevent misuse, access to the G.E.C.K. facility requires a vote of the Community Council.

Export Audio Recording - 11/20/78, 12:04[]

Transcript

Exporting Community Council recording for 11/20/78...
...done.

Greenhouse control terminal [Vault raids][]

Note: The variables "<Request1>" and "<Request2>" could be set to any of the following values, provided that each variable is unique and corresponds to the correct experiment type:

  • CA-5: Cirsium discolor (Thistle)
  • CC-2: Cornus canadensis (Crackerberry)
  • CC-4: Cornus florida (Dogwood)
  • CD-3: Cucumis melo (Melon)
  • CD-5: Cucurbita pepo (Pumpkin)
  • DA-3: Daucus carota sativus (Carrot)
  • IC-4: Iresine herbstii (Bloodleaf)
  • LA-1: Lagenaria siceraria (Gourd)
  • PA-5: Panax ginseng (Ginseng)
  • PB-1: Parthenocissus quinquefolia (Creeper)
  • PC-2: Phaseolus vulgaris (Bean)
  • RB-3: Rhododendron maximum (Rhododendron)
  • RC-5: Rosa acicularis (Wild Rose)
  • RD-1: Rubus allegheniensis (Blackberry)
  • SA-2: Sarracenia rubra (Pitcher Plant)
  • SD-5: Symphyotrichum Cordifolium (Aster)
  • TC-5: Triticum monococcum (Wheat)
  • TD-3: Typha angustifolia (Cattail)
  • VA-2: Vaccinium macrocarpon (Cranberry)
  • ZB-1: Zea mays mays (Corn)
  • AA-1: Ammonia, Anhydrous
  • AA-2: Arsenic, Powdered
  • AB-3: Biowaste, Solution
  • AB-4: Bromine, Isolate
  • AC-1: Cadmium, Powdered
  • BA-4: Organochlorine, Solution
  • BB-1: Plutonium, Isotope Suspension
  • BB-5: Radium, Gaseous
  • BC-3: Sodium Cyanide
  • BD-4: Uranium, Isotope Suspension
Transcript

Welcome to ROBCO Industries (TM) Termlink

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 0:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
-NONE-

For the safety and well-being of our community, all research experiments require prior approval from the Vault 94 Community Council.

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 1:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Type-III Crop Hybridization

RESEARCH PROTOCOL: KH-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] Insert: <Token.Name=Request2>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 2:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Type-IV Experimental Hybridization

RESEARCH PROTOCOL: XH-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] Insert: <Token.Name=Request2>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 3:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Mutational Load Acquisition from Radioactive Soil

RESEARCH PROTOCOL: RA-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] Insert: <Token.Name=Request2>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 4:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Selection for Drought Tolerance Characteristics

RESEARCH PROTOCOL: TD-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] <Token.Name=Pump1>: Enter Code <Token.Value=PumpCode1>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 5:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Aquaculture Viability Analysis

RESEARCH PROTOCOL: AQ-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] <Token.Name=Pump1>: Enter Code <Token.Value=PumpCode1>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 6:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Isotope Uptake from Radioactive Groundwater

RESEARCH PROTOCOL: WR-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] <Token.Name=Pump1>: Enter Code <Token.Value=PumpCode1>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 7:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Rainfall Variability Impact Study

RESEARCH PROTOCOL: WV-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] <Token.Name=Pump1>: Enter Code <Token.Value=PumpCode1>
[<Token.Name=Request2Done>] <Token.Name=Pump2>: Enter Code <Token.Value=PumpCode2>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 8:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Contaminant Impact on Germination Potential

RESEARCH PROTOCOL: XG-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] Insert: <Token.Name=Request2>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 9:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Environmental Toxicity: Survival Assessment

RESEARCH PROTOCOL: XT-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] Insert: <Token.Name=Request2>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 10:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Resource Competition in Crowded Habitats

RESEARCH PROTOCOL: GC-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] Insert: <Token.Name=Request2>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 11:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Secondary Chemical Impact Study

RESEARCH PROTOCOL: XI-<Token.Value=ProtocolID>

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] Insert: <Token.Name=Request2>

If V94_2_Green_GreenhouseTerminalExperimentIDValue is set to 12:

Transcript

=================================================
| VAULT 94 AGRICULTURAL RESEARCH CENTER |
| GREENHOUSE <Token.Value=GreenhouseID> |
=================================================

ACTIVE EXPERIMENT:
Community Garden

RESEARCH PROTOCOL: N/A

RESEARCH REQUIREMENTS:
[<Token.Name=Request1Done>] Insert: <Token.Name=Request1>
[<Token.Name=Request2Done>] Insert: <Token.Name=Request2>

If the requisition holotape is available:

Export Requisition Holotape[]

Transcript

Exporting Requisition Holotape... done.

For experiments requiring seed or chemical samples, Requisition Holotapes may be used to authorize disbursement of samples from the Agriculture Wing's Seed Bank and Chemical Bank storage areas.

Insert the Requisition Holotape into the appropriate control terminal to requisition the required samples.

Greenhouse monitoring terminal[]

Transcript

========================================
Temperature Regulation System: *ERROR*
---Greenhouse #1: *ERROR*
---Greenhouse #2: *ERROR*
---Greenhouse #3: *ERROR*
---Greenhouse #4: *ERROR*
Radiation Sensors: *ERROR*
Macroorganism Sensors: *ERROR*
Microorganism Sensors: *ERROR*

ERROR: Multiple faults detected. Please contact a technician for assistance.

Greenhouse Controls[]

Transcript

Accessing Greenhouse Control System...
...failed.

ERROR: Unable to connect to the Greenhouse Control System. Please contact a technician for assistance.

Transcript

Accessing...

Pest Control System[]

Transcript

ZapZ Electric Pest Control System
Status: INACTIVE

Transcript

Accessing...

Activate Pest Control System[]

Transcript

Accessing ZapZ Control Interface... done.
Activating ZapZ!

Transcript

Accessing...

Deactivate Pest Control System[]

Transcript

Accessing ZapZ Control Interface... done.
Deactivating ZapZ!

Transcript

Accessing...

Access Security System[]

Transcript

Accessing Vault-Tec Security Interlink...
...0 Security Turret(s) found.
...0 Security Robot(s) found.
...0 Other Security System(s) found.

ERROR: No security systems available.

ADMINISTRATOR NOTE***
Due to Vault-Tec directives, Vault 94 has not been equipped with defensive systems, and all robots have been locked to a nonviolent conflict resolution protocol. Please see the Community Council Terminal for more information.

Transcript

Accessing...

Issue Administrator Password[]

Transcript

Verifying Credentials...
...done.
Issuing Network Administrator Password...
...done.

WARNING: Due to union regulations, this password cannot unlock any terminal requiring a MaintainenceIn-game spelling, punctuation and/or grammar Access Code.

Transcript

Authorizing...

Nursery terminal[]

Transcript

Welcome to ROBCO Industries (TM) Termlink

====================================
| VAULT 94 COMMUNITY NURSERY |
====================================

Please select a report to view:

11/19/78[]

Transcript

====================================
| VAULT 94 COMMUNITY NURSERY |
====================================
====================================
|11/19/78 |
|Nurse: Leah Rossi |
|Aide: Angelique Salavar |
====================================

Charges: E. Hendricks, T. Garcia, R. Hudson, T. Hudson, P. Lorenzo, K. Rossi

Daily Report:
 - Eve continues to teethe on crib frame.
 - Argument between Ruth and Paul over teddy bear. Rehearsed cooperative de-escalation dialogue. Further reinforcement needed.

Transcript

Accessing...

11/20/78[]

Transcript

====================================
| VAULT 94 COMMUNITY NURSERY |
====================================
====================================
|11/20/78 |
|Nurse: Rachel Hendricks |
|Aide: Angelique Salavar |
====================================

Charges: E. Hendricks, R. Hudson, T. Hudson, J. Malara, P. Lorenzo, K. Rossi

Daily Report:
-NONE FILED-

Transcript

Accessing...

Operations terminal[]

Note: The text that was displayed depended on the progress of the current Vault Mission.

Transcript

========VAULT 94 OPERATIONS CENTER=======
|Vault Status: EMERGENCY |
|Vault Door: SEALED |
|EMERGENCY OPERATION IN PROGRESS |
=========================================
=====EMERGENCY MAINTAINENCE PROTOCOL=====
|Flood Control System: <Token.Name=V94PumpStatusFloodControl>
|Flood Control Pump Alpha: <Token.Name=V94PumpStatusAlpha>
|Flood Control Pump Beta: <Token.Name=V94PumpStatusBeta>
|Flood Control Pump Gamma: <Token.Name=V94PumpStatusGamma>
|Flood Control Pump Delta: <Token.Name=V94PumpStatusDelta>
=========================================
PROTOCOL INSTRUCTIONS:
- Proceed to the Pump Control Station.
- Activate Emergency Flood Control Procedure K-52.

Transcript

==========VAULT 94 OPERATIONS CENTER=========
|Vault Status: EMERGENCY |
|Vault Door: SEALED |
|EMERGENCY OPERATION IN PROGRESS |
=============================================
===============HAZMAT PROTOCOL===============
|Radiation Level: CRITICAL |
|Internal Sensors: <Token.Name=V94OpsSensorGridStatus>
|Radiation Source: <Token.Name=V94OpsRadiationSource>
=============================================
PROTOCOL INSTRUCTIONS:
- Activate Internal Sensors to isolate the source.
- Identify and neutralize the source.

Transcript

==========VAULT 94 OPERATIONS CENTER=========
|Vault Status: EMERGENCY |
|Vault Door: SEALED |
|EMERGENCY OPERATION IN PROGRESS |
=============================================
=========EMERGENCY FLOODING PROTOCOL=========
|Security State Code: AX-481 |
|Flooding Protocol: M-09 |
|Emergency Evacuation: IN PROGRESS |
=============================================
PROTOCOL INSTRUCTIONS:
- Flooding Protocol M-09 activated successfully.
- Complete the Emergency Evacuation.

Activate Internal Sensor Network[]

Transcript

Accessing Sensor Network Controls...
...done.
Recalibrating Sensors...
...done.
Activating Internal Sensor Network...
...done.

Radiation source detected in the G.E.C.K. Wing.

Transcript

Accessing...

G.E.C.K. Wing Access Controls[]

Note: This text was displayed if one had gained access to the G.E.C.K. wing.

Transcript

=================================================
| VAULT 94 G.E.C.K. WING ACCESS CONTROLS |
=================================================
|G.E.C.K. WING ACCESS AUTHORIZED |
|G.E.C.K. Wing: <Token.Name=V94GeckWingAccessState>
=================================================

Note: This text was displayed if one had not yet gained access to the G.E.C.K. wing.

Transcript

=================================================
| VAULT 94 G.E.C.K. WING ACCESS CONTROLS |
=================================================

ERROR: ACCESS DENIED

Access to the G.E.C.K. Wing requires authorization from the Vault 94 Community Council.

Transcript

Accessing...

Release G.E.C.K. Wing Seals[]

Transcript

Confirming Authorization... done.
Accessing G.E.C.K. Wing Seals... done.
Releasing Seals... done.

Pump control station[]

Transcript

=================================================PUMP STATUS===============
Flood Control System: <Token.Name=V94PumpStatusFloodControl>
Flood Control Pump Alpha: <Token.Name=V94PumpStatusAlpha>
Flood Control Pump Beta: <Token.Name=V94PumpStatusBeta>
Flood Control Pump Gamma: <Token.Name=V94PumpStatusGamma>
Flood Control Pump Delta: <Token.Name=V94PumpStatusDelta>===================================
Emergency Procedures: <Token.Name=V94PumpProcedureActive>
Current Emergency Procedure: <Token.Name=V94PumpCurrentProcedure>===================================

All pumps are operating normally.

Activate Emergency Procedure[]

Transcript

========================================

Please select the desired Emergency Procedure:

Transcript

Accessing Procedures...

B-51[]

Transcript

Initiating Replacement Procedure B-51...
Beginning automated replacement of pump filters...
...failed.

ERROR: No replacement filters are available. Please contact Vault-Tec Procurement and reorder part VT-91Z-87JXZ01.

Transcript

Accessing...

C-51[]

Transcript

Initiating Morale Procedure C-51...
...failed.

ERROR: The Aquaculture Lab Pool Party has been rejected by the Vault 94 Community Council. Better luck next time.

Transcript

Accessing...

G-16[]

Transcript

Initiating Automation Procedure G-16...
Activating Emergency MaintainenceIn-game spelling, punctuation and/or grammar Robots...
...failed.

ERROR: Emergency MaintainenceIn-game spelling, punctuation and/or grammar Robots are not qualified to perform the required operations.

Transcript

Accessing...

J-01[]

Transcript

Initiating Technical Support Procedure J-01...
Attempting to power-cycle the pumps...
...no effect.
Attempting to power-cycle the pumps...
...no effect.
Attempting to power-cycle the pumps...
...no effect.

Please inform Vault-Tec MaintainenceIn-game spelling, punctuation and/or grammar that you have attempted to power-cycle the pumps, then repeat this procedure as requested.

Transcript

Accessing...

H-62[]

Transcript

Initiating Scheduling Procedure H-62...
ERROR: No such procedure exists.

Transcript

Accessing...

K-07[]

Transcript

Initiating Power Regulation Procedure K-07...
Attempting to recalibrate impeller voltage...
...failed.

ERROR: Calibration aborted to avoid further damage to pump circuitry.

Transcript

Accessing...

K-18[]

Transcript

Initiating Cleaning Procedure K-18...
Beginning emergency chlorine flush of Aquaculture Lab Vats...
...failed.

ERROR: Excessive urea concentrations still detected.

ERROR: Chlorine reserves depleted. Please replace the chlorine supply and try again.

Transcript

Accessing...

K-52[]

Transcript

Initiating Flood Control Procedure K-52...
Rerouting power to the remaining Flood Control Pump(s)...
...done.

Emergency Flood Control Procedure K-52 was activated successfully.

Transcript

Accessing...

K-52[]

Transcript

Initiating Flood Control Procedure K-52...
...failed.

ERROR: Unable to activate Emergency Flood Control Procedure due to lack of flooding.

Transcript

Accessing...

L-21[]

Transcript

Initiating Morale Procedure L-21...
Activating automated heat and agitation mode...
...no effect.
Deactivating automated heat and agitation mode...
...done.

The emergency hot tub protocol has failed.

Transcript

Accessing...

M-09[]

Transcript

Initiating Flooding Procedure M-09...
...done.

Please follow the instructions from the Mainframe to complete the activation process.

Transcript

Accessing...

M-09[]

Transcript

Initiating Flooding Procedure M-09...
...failed.

ERROR: The Emergency Flooding Procedure is counterindicated by the current emergency flooding.

Transcript

Accessing...

N-40[]

Transcript

Initiating Reporting Procedure N-40...
Collecting automated diagnostic data... done.
Plotting performance variables... done.
Analyzing operational characteristics... done.
Reticulating splines... done.

MaintainenceIn-game spelling, punctuation and/or grammar reports have been generated and forwarded to Vault-Tec for postmortem analysis. Please stand by.

Transcript

Accessing...

P-47[]

Transcript

Initiating Exhaust Procedure P-47...
Venting pump radiation filters...
...done.

WARNING: Improper ventilation detected in the Pump Control Station. Please clear the room until radiation levels have returned to normal.

Transcript

Accessing...

S-97[]

Transcript

Initiating Search Procedure S-97...
Attempting to identify missing pump components...
...failed.

ERROR: All pumps appear to be intact.

Transcript

Accessing...

V-17[]

Transcript

Initiating Service Call Procedure V-17...
Contacting Vault-Tec MaintainenceIn-game spelling, punctuation and/or grammar for scheduled service...done.

The next available service window is in ERRx99999999 days. Please wait for assistance.

Transcript

Accessing...

W-05[]

Transcript

Initiating Flailing Procedure W-05...
Inverting water intake and outflow pipes...
...failed.
Setting all pipes to intake...
...failed.
Setting all pipes to outflow...
...failed.
Adjusting settings randomly... ... ...
...failed.

ERROR: Operation failed.

Transcript

Accessing...

Vault 94 emergency management terminal[]

Note: The text displayed depended on the availability of the daily Vault Mission.

Transcript

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================
Emergency Code: [FC-855] Flooding, Severe

Diagnosis: Catastrophic flooding has been detected in the Vault. Flood Control system failure is imminent.

Resolution Protocol:
- Proceed to the Pump Control Station.
- Activate Emergency Flood Control Procedure K-52.

Transcript

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================
Emergency Code: [FC-855] Flooding, Severe

Diagnosis: Catastrophic flooding has been detected in the Vault. Flood Control system failure is imminent.

Resolution Protocol:
- Proceed to the Pump Control Station.
- Activate Emergency Flood Control Procedure K-52.

This operation is in progress.

Transcript

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================
Emergency Code: [RZ-504] Nuclear Emergency, Internal

Diagnosis: An unidentified nuclear event is in progress. Radiation inside the Vault have reached critical levels.

Resolution Protocol:
- Proceed to the Operations Center.
- Identify the source of the radiation.
- Neutralize it.

Transcript

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================
Emergency Code: [RZ-504] Nuclear Emergency, Internal

Diagnosis: An unidentified nuclear event is in progress. Radiation inside the Vault have reached critical levels.

Resolution Protocol:
- Proceed to the Operations Center.
- Identify the source of the radiation.
- Neutralize it.

This operation is in progress.

Transcript

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================
Emergency Code: [AX-481] Infestation, Insects

Diagnosis: The Vault has been infested with [Giant Mutant Insects]. Extreme measures are justified in controlling the infestation.

Resolution Protocol:
- Proceed to the Pump Control Station.
- Activate Emergency Flooding Procedure M-09.

Transcript

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================
Emergency Code: [AX-481] Infestation, Insects

Diagnosis: The Vault has been infested with [Giant Mutant Insects]. Extreme measures are justified in controlling the infestation.

Resolution Protocol:
- Proceed to the Pump Control Station.
- Activate Emergency Flooding Procedure M-09.

This operation is in progress.

Begin Mission[]

Transcript

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================

Please confirm that your team has assembled and is ready to begin. Once you confirm your acceptance of this mission, the Vault Door will cycle, and no further personnel will be permitted in or out of the Vault until the operation has been completed.

Transcript

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================

ERROR. Only maintenance supervisor <Token=TeamLeaderPlayer> is currently authorized to begin this mission. Please stand by.

Confirm[]

Note: Accessing this entry began the daily Vault Mission.

Cancel[]

Note: Accessing this entry brought one back to the main menu.

Vault access control terminal [Vault raids][]

Transcript

=======Welcome to Vault 94=======
|Vault Status: <Token.Name=StatusBar>
|Vault Door: <Token.Name=DoorStatusBar>
=================================

Welcome Letter[]

Transcript

FROM THE PASTOR'S DESK:

Greetings, and Welcome to Vault 94!

On behalf of the Vault 94 intentional community, it is my pleasure to welcome you to our home. Vault 94 is founded on the principles of faith, nonviolence, and communal life in harmony with nature. Whether you share our beliefs or choose to walk your own path, know that you are always welcome among us.

Vault 94 was blessed with an abundance of resources, and we are committed to sharing them with all in need as we work together to restore the bounty of the Earth. More importantly, we hope to share our values and rebuild a common belief in the essential goodness of humanity.

If you are hungry, come and eat. If you are weary, come and rest. If you are here to trade, our stores are always open. Welcome to Vault 94. Welcome home.

--Pastor Gabriella Salavar

P.S. Please check any weapons or explosives at the reception desk as you enter.

Transcript

Accessing...

> Vault Door Control[]

Transcript

Accessing...

Enter Access Code[]

Transcript

Decrypting Access Code...
...done.
Authenticating...
...done.
Accessing Vault Door Control Interlink...
...done.
Opening Vault Door...

Transcript

Accessing...

Search Access Code Database[]

Transcript

Accessing Vault 94 Resident Database...
...done.
Cross-referencing with Pip-Boy tracking data...
...done.

A Vault Ambassador with an Access Code was dispatched to <Token.Name=V94AccessDungeon> on or about 10/23/78. Please contact them for further assistance.

Transcript

Connecting...

Mainframe access terminal[]

FO76 V94 (Mainframe Access Terminal)
Transcript
=====================================[]

Mainframe Controls[]

Transcript

Accessing Mainframe Control Interface... failed.

ERROR. The Emergency Management System is active. Normal mainframe operations have been suspended.

Security System Controls[]

Transcript

Accessing Vault-Tec Security Interface...
...0 Security Turret(s) found.
...0 Security Robot(s) found.
...0 Other Security System(s) found.

ERROR: No security systems available.

***ADMINISTRATIVE NOTE***
Vault 94 has not been equipped with defensive systems, and all robots have been locked to a nonviolent conflict resolution protocol. Refer to your Vault documentation for details.

Advertisement